Commonwealth Edison j
i C
one First National Plaza. Chicago. Ilhnois
-6 i
G Address Reply to: Post Office EioT767 Chicago Illinois 60690 z
January 18, 1982
/
{ /lTTNCIPM, STM7_
i vim: V,j_M E
~
N Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Vn _f d t.!L Enforcement - Region III gpy jd U.S. Nuclear Regulatory Commission
' ~~'
l 799 Roosevelt Road y
-1 [L[d(..'/d i Glen Ellyn, IL 60137 ggsor erje
Subject:
Byron Station Units 1 and 2 Control Panel Inspection NRC Docket Nos. 50-454 and 50-455 i
Reference (a):
March 13, 1981, letter from Cordell Reed to J. G. Keppler
Dear Mr. Keppler:
i
.This is the sixth status report on the control panel weld inspection program at Byron which was described in reference (a).
The following actions have been completed:
1.
All safety related panels have been inspected at byron Station.
i 2.
Westinghouse has completed their review of the Systems i
Control Panels in the control room, and have made recommendations for strengthening of the boards.
We are implementing those recommendations.
3.
The inspection results from the other safety related panels indicate that the panels are acceptable as is.
However, we are seeking the individual board vendor's concurrence with I
this conclusion.
We do not yet have that concurrence.
For your information, the same actions that were completed l
at the Byron Station were also completed at the Braidwood Station with similar results.
Please address questions on this matter to this of fice.
I l
Very truly yours, f T. 'R.
Tramm Nuclear Licensing Administrator l
1m l
3257N M
820310o174 e20304 PDR ADOCK 05000454
.S _ _.._---,_..PDR
'