Notice of Issuance & Availability of Amend 43 to License NPF-3
ML20041E122
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/26/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20041E117 List:
References
NUDOCS 8203100165
Download: ML20041E122 (2)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-346 THE TOLEDO EDISON COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has iscued Amendment No. 43 to Facility Operating License No. NPF-3, iss;ed to The Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees), which revised Technical Specifications (TSs) for operation of the Davis-Besse Nuclear Power Station, Unit No.1 (the facility) located in Ottawa County, Ohio. The amendment is effective as of its date of issuance.

This amendment changes the TSs to permit a one-time extension to the maximum surveillance interval for certain surveillance requirements which are due on various dates in March 1982 This extension permits continued facility operation to a revised refueling outage start date of March 19, 1982, for the purpose of accomplishing more pre-outage work required to complete the large number of THI-related modifications during refueling.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

G203100165 820226 PDR ADOCK 05000346 P

PDR

2-7590-0T

~

The Comission has detennined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 151.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated February 23, 1982, (2) Amendment No. 43 to License No, All of these NPF-3, and (3) the Comission's related Safety Evaluation, items are available for public inspection at the Comission's Public Document Room,1717 H Street, NW, Washington, DC, a1d at the Willian Carlson Library, University of Toledo, 2801 W. Bancroft Avenue, Toledo, Ohio. A copy of items (_2) and (3) may be obtained upon request addressed to the U. 5, 20555, Attention:

Director, Nuclear Regulatory Comission, Washington, D. C.

Division of Licensing.

Dated at Bethesda, Maryland, this 26tii day of February 1982.

FOR THE NUCLEAR REGULATORY COMMISSION ab.n F. Stolz, Chief perating Reactors Br nch #4 ivision of Licensing e