ML20041E002
| ML20041E002 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 03/02/1982 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20041D997 | List: |
| References | |
| NUDOCS 8203090787 | |
| Download: ML20041E002 (3) | |
Text
,o 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET 80. 50-256 PUBLIC SERVICE COMPANY OF COLORADO NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 25 to Facility Operating License No. OPR-34 issued to the Public Service Company of Colorado, which revised Technisal Specificat.fons for operation of the Fort St. Vrain Generating Station (the facility) located in Platteville, Colorado. The amendment is effective.as of the date of issuance.
The amendment modifies the ifcense to permit possession of additional sources and revise the Technical Specifications to:
(1) specify the period of time and conditions under which the Unit Auxiliary Transformer:
can be removed from service with the reactor at power, (2) substit'ute the
~
requirement for an Annual Operating Report with an Annual Occupational Exposure Report and a Monthly Operating Report, (3) allow manual reset of the 30% bistables for operation at less than 30% but greater than 10% power, (4) require operability of snubbers when the reactor is at power, (5) establish e
i an upper time limit for loss of voltage to 480 volt buses and the method to be used during surveillance testing, (6) substitute outdated requirements with those that comply to 10 CFR 20.103, (7) revise the method of performing thermocouple testing, (8) specify the testing of carbon sample cannisters as per NRC requirements, and (9) include two additional snubbers.
8203090787 820302 PDR ADOCK 05000267 P
u 2-l the Commission's Public Document Room,1717 H Street, N.W., Washington, D. C.
20555 and at the Greeley Public Library,, City Complex Buidling, Greeley Colorado. A copy of items (2) and- (3) may be obtained upon l
requ,est to the U. S. Nuclear Regulatory Commission, Wash'ington, D. C.
20555, Attention: Of rector, Division of Licensing.
Dated at Bethesda, Maryland this 2nd day of March,1982.
FOR THE NUCLEAR REGULATORY COMMISSION b
Robert A. Clark, Chief Operating Reactors Branch #3
. Division of Licensing e
e l
i t
,7 9
v p
r
-m y
e 7590-01 The applications for the amendment comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's
~
rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since this amendment dces not involve.a significant hazards consideration.
The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the application for amendment dated January 20, 1978, April 14, 1975, May 9,1978, June 19,1979, July 24,1980, and December 31 1980; e
(2) Amendment No. 25 to Facility Operating License No. OPR-34; and (3) the Commission's related Safety Evaluation. These items are available for public inspection at the Commission's Public e
e
.