Forwards QA Program Insp Rept 99900763/81-01 on 811117-18 & Notices of Nonconformance & Violation
ML20041D582
Person / Time
Issue date: 02/17/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: J. J. Barton
NPS INDUSTRIES, INC.
Shared Package
ML20041D583 List:
References
REF-QA-99900763 NUDOCS 8203050433
Download: ML20041D582 (3)


Text

.

N gg 17 o>

Docket No. 99900763/81-01 c

NPS Industries, Inc.

2 N QQ\\

9 W

ATTN:

Mr. J. F. Barton S#

0gbh."" f r

President One Harmon Plaza Secaucus, New Jersey 07094 p,

Gentlemen:

This refers to the inspection conducted by D. F. Fox of this office on November 17-18, 1981, of your facility at Secaucus, New Jersey, associated with the design of component supports and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made in concert with an inspection of Nuclear Power Services, Inc. as a result of concerns expressed to the NRC pertaining to possible errors and deficiencies in the design of component supports which could result in the failure of supports being provided to the Texas Electric Generating Company, Comanche Peak Steam Electric Station, Units 1 and 2.

Areas examined and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

The Notice of Violation is sent to you pursuant to the provisions of 10 CFR Part 2.201.

You are required to submit to this office within 30 days from the date of this letter, a written statement containing, (1) a description of steps that have been or will be taken to correct the items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or will be completed.

Consideration may be given to extending your response time for good cause shown.

You are also requested to submit a similar written statement for the item in the enclosed Notice of Nonconformance.

N M

i' b

EMS./N RSS h IES

}

VIB Y RA-IV RSS-RIS 0 Fox LEll haw JTapia

.CHale JGa 1ardo UPotapovs JTCollins 82

~1/2f/82 2//7/82 1/15/82 iso 82 1/1//82 1//g/82 kauwa}a ll q

0203050433 820217 h[d 0

DR

NPS Industries, Inc.

2 i

The responses directed by this letter are not subject to the clearance l

l procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

You will note that report section D.3 relates to what we view as a significant weakness in your quality assurance program in that your vendor surveillance activities did not detect significant long term deficiencies in the Nuclear Power Services, Inc., programs for personnel qualification, design control, and quality assurance, that were identified in NRC inspection report l

99900531/81-01.

Consequently, in addition to the information requested above, please describe actions that you plan to take to assure that your vendor surveillance activities will be effective in the control of quality by all of your subcontractors as required by Criterion VII of Appendix B to 10 CFR Part 50.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) f submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.

Consistent with section 2.790(b)(1), any such application must be accompanied t

by an affidavit executed by the owner of the information which identifies the

~

document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information saught to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this l

regard within the specified periods noted above, the report will be placed in i

the Public Document Room, l

I l

NPS Industries, Inc.

3 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

(

(Ltb'x bg Uldis Potapovs, Chief I

Vendor Inspection Branch cc:

C. Halpern Chief, Executive Officer l

Enclosures:

1.

Appendix A - Notice of Violation 2.

Appendix 8 --Notice of Nonconformance 3.

Appendix C - Inspection Report No. 99900763/81-01 i

4.

Appendix 0 - Inspection Data Sheets (7 pages) l bec:

Chief, V&SPB, DR&RRI, HQS (REINMUTH)

IE FILES i

AE0D NMSS QAB NRC: PDR REG. ADMINISTRATORS I, II, III,IV, V JEGAGLIARDO, RIV ASME NBB&PVI 1