ML20041D126

From kanterella
Jump to navigation Jump to search
Public Version of Revision 3 to Emergency Plan Implementing Procedure Index,Consisting of Revised Pages 1,4 & 5 to Procedure 420-1, Technical Support Ctr Quarterly
ML20041D126
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/11/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20041D099 List:
References
420-1-01, 420-1-1, NUDOCS 8203040321
Download: ML20041D126 (4)


Text

-

~

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX DATE NtNEER TITLE 370-2 First Aid and Decontamination 2-18-81 7-01-81 410-1 On-site Suppcrt Center FEB 111982 420-1 Technical St.pport Center Quarterly Surveillance 12-15-81 440-1 Emergency Communications 450-1 Emergency Operations Facility Quarterly Surveillance 12-15-81 510-1 Maintaining Emergency Preparedness 2-18-81 510-2 GSEP Training Requirements for Rad / Chem Technicians 5-22-81

~

550-1 On-Site Non-Radiological Emergency Response Equipment 12-15-81 550-2 Envircnmental Emergency Kit Radiological Equipment 12-15-81 550-3 Raciolcgical Supplies for Medical Emergencies 12-15-81 550-4 On-Site Radiological Emergency Response Equipment 12-15-81 550-5 Technical Support Center and Operational Support Center Radiological Supplies 12-15-81 700-1 Emergency Phone List 1-18-82 ATTACHENT 1 Spill Prevention Control & Countermeasure Plans 12-15-81 i

y = e.

(,

  • 8203040321 820225 APPROVED N PDR ADOCK 05000295 F

PDR g,g 4 0039E 2

0006A

.. l o

s TECFNICAL SUPPORT CENTER CUARTERLY SURVEILLANCE EPIP 420-1 TAB.E OF CONTENTS SECTION TITLE PAGE DATE REVISION Table of Centents 1

FEB 111982 3

A.

Purpose 2

12-15-81 2

8.

References C.

Prerequisites D.

Precautions E.

Limitations & Actions F.

Procecure 3

12-15-81 1

G.

Checklist H.

Technical Specification / References Attac!Tnent A 4

FEB 111982 2

5 FEB I 1 ;gg 2

e.

a*%

Ay' This procedure contains 5 pages.

APPROVED I f 1-0042E 1

DATE 2-/I-30 me

EPIP 420-1 Rev. 2 FEB 111982 ATTAChhENT A TSC EQUIFFENT GPERATIONAL CHEO< LIST j

\\

1 I

EQUIPMENT PASSED FAILED CDMlENTS Teleccoler Cooier Food Sucoly Offica Stro11es SyFA Cegicuter Operator's CRT S WA Comouter Centronics Printer U1 PrccSss Ccmouter CRT

.l U1 Process Comouter DEC LAl20 Printer l

U1 Prccess Comouter Disolay Screen #3 U1 Process Comouter Disolay Screen #4 U2 Process Ccmouter CRT U2 Process Comouter Disolay Screen #3 U2 Process Comcuter Disolay Screen #4 Date:

Initials:

C T

0042 4

L esreva

EPIP 420-1 Rev. 2 FEB 111982 ATTACHENT 8 b"

TSC DOCU E NTS CHEO< LIST CE5CRIPTION Quantity Quantity COMPENTS Recuired Present RP Precedures #45 (2 volumes) 1 ZCP Procedures #39 1

HP Reference Bocks CCP#7; CSP #7 1 ea GSEP/ Annex #539 1

Zion EPIP's #55 1

Environmental Director EPIP's #57 1

RP In-Plant Survey Macs 10 ea ACP Procedures /EOP

  1. 47 1

Tech Scecs #44 1

P&ID's (set) 1 SOI #39 (5 volumes) 1 ZED #10 (2 volumes) l p/

x.

WI CEG Plan #120 1

IL PRA

  1. 45 1

,f i

/

/

Cate:

Initials:

W.A FINAL 0042E 5

65MS

<