__
M g
us:TED STATES p"
NUCLEAR REGULATORY COMMISSION g
,j WASHINGTON. D. C. 20666 t
/
%*...*/
POWER AUTHORITY OF THE STATE OF NEW YORK t
DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendnent No. 66 License No. DPR-59 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A. The ~ application for amendment by the Power Authority of the State of New York (the licensee) dated November 18, 1981 complies with the standards and re as amended (the Act)quirements of the Atomic Energy Act of 1954,
, and the Commission's rules and regula-tions set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; Dr The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CPR Part 51 of the Comission's ' regulations and all app 1,1 cable requirements have been satisfied.
I o
8203040078 820212 PDR ADOCK 05000333 p
2 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices 1
A and B, as revised through Amendment No. 66
, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: February 12, 1982 O
e
J ATTACHMENT TO LICENSE AMENDMENT N0. 66 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 Revise Appendix A as follows:
Remove Pages Insert Pages 183 183 245 245 i
e l
3j (cont'd)
JAFNPP 4[7 (cont'd) e.
At least once per operating cycle, manual operability of the bypass valve for filter cooling shall be denonstrated.
f.
Standby Gas Treatment System Instrumentation Calibration:
differential Once/ operating pressure Cycle 2.
Frcm and after the date that one circuit switches of the standby Gas Treatnant System is made or found to be inoperable for any 2.
When one circuit of the Standby reason, the following t.ould apply:
Gas Treabrent System becmes inoperable, the operable circuit a.
If in Start-up/ Hot Standby, Run or shall be demonstrated to be Hot Shutdown mcde, reactor operation operable inmediately and daily or irradiated fuel handling is thereafter.
permissible only during the succeeding 7 days unless such circuit is sooner made operable, provided that during such 7 days all active ccmponents of the other Standby Gas Treatment Circuit shall be operable.
b.
If in Befuel or Cold Shutdown mode, reactor operation or irradiated fuel handling is permissible only during the succeeding 31 days un-less such circuit is sooner made operable, provided that during' such 31 days all active ccmponents of the other Standby Gas Treatment Circuit shall be operable.
3.
If Specifications 3.7.B.1 and 3.7.B.2 are not met, the reactor shall be placed in the cold condition and irradiated fuel handling operations and operations that could reduce the shutdown margin shall be prohibited.
183 Amendment No g 66
JAENPP
+
l 5.0 DESIGi FFATURES B.
The reactor core contains 137 cruciform-shaped control rods 5.1 SITE as described in Section 3.4 of 1
the FSAR.
A. The James A. FitzPatrick Nuclear Power Plant is located on the PAStu 5.3 RF1CIOR PRESSURE VESSEL portion of the Nine Mile Point site, approximately 3,000 ft. east of the She reactor pressure vessel is as l
Nine Mile Point Nuclear Station, Unit 1.
described in Table 4.2-1 and 4.2-2 The PNP-JAP site is on Iake Ontario of the FSAR. The applicable design in Oswego Country, New York, approxi-codes are described in Section 4. 2 mately 7 miles northeast of Oswego, of the FSAR.
The plant is located at coordinates north 4,819, 545.012 m, east 386, 968.945 m, 5.4 CINTAIPNENT on the Universal Transverse Mercator Systen.
A.
The principal design parameters and characteristics for the B. The nearest point on the property primary contairrnent are given in line frun the reactor building and Table 5.2-1 of the FSAR.
any points of potential gaseous effluents, with the exception of the B.
The secondary contairrnent is as lake shoreline, is located at the described in Section 5.3 and the northeast corner of the property.
applicable codes are as described This distance is approximately in Section 12.4 of the FSAR.
3,200 ft. and is the radius of the exclusion areas as defined in 10 CFR C.
Penetrations of the primary con-100.3.
tairunent and piping passing through such penetrations are designed in 1
5.2 REACIOR accordance with standards set forth I
in Section 5.2 of the ESAR.
A. The reactor oore consists of not 5.5 EVEL STORAGE more than 560 fuel assenblies. For l
the current cycle three fuel types A.
The new fuel storage facility design are present in the core:
criteria are to maintain a K eff dry 8x8, 8x8R and P8x8R. These fuel 4,0.90 and flooded < 0.95.
)
types are described in NEDO-240ll.
Ocupliance shall be verified prior to The 8x8 fuel has 63 fuel rods and introduction of any new fuel design 1 water rod, and the 8x8R and to this facility.
P8x8R fuel have 62 fuel rods and 2 water rods.
Amendment No. )W,'Jt,'pa", f 66 245
-