_

y o

2 4 FEB 1982 Docket No. 50-293 HEMORNIDUM FOR: Brian rs. Grimes, Director, Division of Emergency Preparedness IE FROM:

George H. Smith, Director Division of Emergency Preparedness &

Operational Support, RI

SUBJECT:

PROMPT PUBLIC NOTIFICATI0fl SYSTEM FOR THE PILGRIM NUCLEAR POWER STATION Enclosed as a matter of general information is a copy of a letter to Ronald C. Haynes from J. Edward Howard dated February 16, 1982. The letter reports on the status of the installation of the prompt notification system around the Pilgrim Nuclear Power Station.

V "inal 31sned By:

m 4&'

Georgt H. Smith, Director Divis/;on of Emergency Preparedness &

Operational Support i

Ecclosure: As Stated c': l;~

cc (w/ encl):

N J. Lieberman, Director, Enforcement Staff. IE S. Schwartz, DEP, IE b.

RSt,

g; c

t

/,,'.a n 7

, ~i

,d '

bcc (w/enci):

Ea g;.g; 1323,);

t R. Starostecki, DPRP A ~

/j~

H. W. Crocker, EPS A

.x /

.s br.

s

/ lb s f.'

..Y f

B203020519 820224 I

PDR ADOCK 05000293 F

PDR 5,

k......,.,.,,,.,,,..,,..,,.,,

EP'&PSB,:RI,,DEf0SgRI',,,

omce >

(

su - c>..SRYDER...

S i/../d/.az....

l om>.2/24/az..

l me ronu sts oo-somscu oaa

/

OFFICIAL RECORD COPY usam mi-r *o

~~~~

7 G O a l O N CDISJN COMPANY GOO novi sicN 319tcT n O 3 T O N. M a ' S a O Hu h t a T s 0 219 9

-0.s.wo bECo Ltr. (82-55 VPSE Ltr. i82-40 i

l Feb ru a ry 16, 1982 t

Mr. Ronald C. Haynes, Di rect or l

Ferien I r

U.S.

!;uclear Twgulat ory Cor nission 631 T. irk Avenue King of Trussia, PA 19406 i.i t er ne No. DPR-35 Docket ro. 50-293 I

Dear Mr. Haynes:

1 The purpose of this letter is to report to you the st atus of Bost on Edison's efforts to complete the prc.mpt public notification system for the Pilgrim NPS area, and to notify you that Bost on Edison now expects to be able to complete installation and test the system prior to February 26, 1982.

Several uncertainties have been resolved favorably during past weeks which ranke the February completion date achievable.

The Board of Selectraen in the Town of Duxbury has approved t he majority of pole site permits re-p quested, and is expected to act on the last two remaining applications on February 22, 1982.

On February 15, 1982, Boston Edison received a last shipment of 16 electronic control units from Federal Signal Corporation.

f The status of the prompt alert syst em insta11aticn ef fort is summarized below.

1.

System Characteristics The system, when complete, will include 90 largc-scale rotating and omnidirectional electronic sirens.

These will be inst alled throughout the EPZ, which includes all of the Towns of Plymouth, Kingston and Duxbury, and parts of the Towns of Marshfield and s

Ca rver.

I l

2.

Site Permitting Permitting actions are cor plet e f c r 84 of 90 pole sites.

Ee-sub-ni:ted petitiere vill :e

.rd.' r(1 r % r. '(:t for two

.tes in P:y outh, 2nd en F( r.., r - 2:nd for twt *ites. n irnb u ry.

The two rer aining sit es in Da., u r v are cn nrc i e rty reed by the Dnbury Fire and 'i.at er De; a rt c.t s.

r, -- n t s are being cxecut ed by the r

appropriate partier for these sites on this date.

7

  1. h O,n' r

i 1 m i. 2 _

j

,7 c.-

c. _,

ymy m

n.

nom en En san cc, vet.<

O 4

Mr. Ronald C. Haynes, Director February 16, 1982 Page two 1

3.

Iqs _t a11 at ion j

t Sirens have been installed at /b sites.

Associated electronic centrol equiptent has been installed at 58 sites.

Electric service to recharge batteries has been provided at 34 sites, and 26 of these have been field tested.

The recent arrival of the balance of control equipment f rom Federal Signal should permit Bost on Ed3 son to complete installation prior to the test on Februa ry 26th.

4.

Test ing Units are being fully checked out in the field following hook-up of electric service (to maintain battery charge).

A comprehensive test will be conducted on a town-by-town basis on the 26th of February.

State, local and Federal Emergency Managenent Agency personnel have been invited to observe and participate.

l

}

Boston Edisen is pleased to be able t o report extensive progress on d

the effort and expects to be able to report completion of the system, and the results of the aforementioned test, before the end of February.

Ve ry t ruly yours,

f 4

7

,A

/

Y s I

/