Mod 20,providing for Phase In-Phase Out Svcs,To Implementation & Operation of NRC Document Control Sys
ML20041B962
Person / Time
Issue date: 02/02/1982
From: Lebo C, Long J
NRC OFFICE OF ADMINISTRATION (ADM), TERA CORP.
To:
Shared Package
ML20041B959 List:
References
CON-NRC-10-78-580 NUDOCS 8202250449
Download: ML20041B962 (3)


Text

m -.....

i i

AMENDMMU OF SULiull Allua/ movuiva44w.

~...s

- ~......

ci No.u se vic e,s AD..

s,..,,0N ND e,x

,G

,i cee,i.i.iDi 4 PROJECT NO f /f ett/.shl./

A*.t Da.r wria.Oc hCatsON NO 2 (f flCIIY1 D171 3 SFQgt$l1QN/Pg3(M1$g $(Qg[)I NO P.FPA ADM-78-580 TWENTY 420) -

2/3/82 cool tdW:)Cm o ADaairesnitD se af vA.e 4^.s elae J/.

CoDL l

$ issues sv U.S. f0 CLEAR REGULATORY COMMISSION Division of Contracts Washington, DC 20555 s

.r. CON 1erCson cool i u aury cootI AnatNDaalNT 08 NAmt fMD ADDtt$1 0 sootr' A'ioM NO.

l-TERA ADVANCED SERVICES CORPORATION l

Darr0

<3. st-a,;

7101 Wisconsin Avenue NRC'-10~78-580

-Oe.iC'

'5"~' "*-

Suite 1400 0 CONrtAc"tio"nDie NO

. - = - ~.

=a ter 8ethesda, MD 20014 c.+ o J

,,,,,s/3/78

,s,,,,,,,,,

L THIS SLOCs Arrut1 ONtT TO AMINDentNTS OF SOtiC3f AliONS 5-

.~. - ~.s *- -. ' oa-O...

a. O... ~-.

P

. - w.* a O ~ ~ -..- -. -- -

OA.-....-.N.-~.o,-..a.-..~-.~

....m.,..........-...~~........~.......m...FAstuti OP 70Un ACsNowitDGlutNT TO st atClivt0 A nre

=h..h

= 6

...ete..

6

.... e..me.e

=hIf. by on.f.h

.me M y

.p.

.ge

.E..

. bem.

h.%

g.

y D.

by i.,*.m

.N...

......~..

..~

..~..

~

.<.a EAlt SPtC8FitD aaAT RESULT IN RUtCTION Of Yout Of fIe 10 CCOVN11NC. AND APPaOPS6AllON DAT A (l/F.fs 74) 4 ll. TuS ELOCK APPuth ONLY TO naOD.FIC ATIONS Of CON 7 TACT 5eOEDil5 m O a..c

.. O

. -.~

, C i n.

~

~

-o,

m O i ~.

.~....

......a.<.....r..e XiN. ~.EE

...o

- w-i nXVIII " Continuity of Services," and the IC m(pi...s

... ~

......~..

., mutuai agreement of both parties.

w.<

w-. : :

12. Dt%CDPflON O. AMENOMEN11.tODescalaON The Statement of Work and Deliverables which follows as Attachment One supercedes in A.

its entirety the previous Statement of Work and Deliverables, as modified, found at Section 3 of this contract.

Section 2, Article I, " Period of Performance" the date is changed to read B.

" April 2, 1982."

Section 2 Article III - Ceiling Price and Availability of Funds, the ceiling l

l C.

The current amount obligated remains I,

price is changed to read $28,707,982.50.

unchanged ($27,745,100.00.)

l s. 4.a.. -

I m

-a -

. ~

..~..

a.....

8 O

NOT ttOWRED CONtaAC10erOrff tos E5 8800:410 TQ GN TMIS DOCuaatNT Ape e

- COPits TO e55U.4G OFract

]

IF. UNITED ST ATES of Ami4lCA

84. Namf CONTR ACTOS /Of f[

D "a,,-. <

s O~,

S

-BY-y m

8.. Daft SaGNED le Daft 5.CNED l$ NAmat Of CON 1tACTING Of flCat iipfw p.sf IS. Naaat frita OF Saccess (Type er p sf Craig D. Lebo

'2/ 2.-/82 2.pr.p2, d. (A,. 6 c,.

..ba.-~ a..**~.a a= -

8202250449 820202 so.,3 PDR CONTR NRC-10-78-580 PDR

TERA ADVANCED E N Contract No. NRC-10-78-580 Modification No. 20 STATEMENT OF WORK AND DELIVERABLES A.

Statement of Work The contractor shall provide phase in, phase out (PIPO) services to the U.S. Nuclear Regulatory Commission (NRC) and its new contractor, Planning Research Corporation (PRC), for a period commencing on February 3,1982 and ending no later than April 2,1982 in accordance with ARTICLE XVIII " Continuity of Services" of the contract and TERA Corporation's "DCS Contract Phase In-Phase Out Plan" dated January 19, 1982., incorporated herein by this reference.

The following contractor personnel shall be available on an "on-call" basis" during the duration of this PIPO effort:

J. Long, Program Management C. Lemon, Project Management W. Ingram, Senior Engineer D. Worthington, Engineer B. Macnichol, Engineer B. Murray, Engineer J. DiSciullo Engineer D. Denton, Chief Technical Codcr/ Abstractor D. Nevins Chief Technical Coder / Abstractor S. Alfaro, Chief Technical Coder / Abstractor S. Kahoonei, Chief Technical Coder / Abstractor B.

Deliverables The contractor shall submit a project status report at the end of each two week period reflecting work accomplished during the previous reporting period, and work planned for the next period.

Reports should cross reference appropriate activities contained in the "DCS Contract Phase In-Phase Out Plan."

The aforementioned report shall be delivered as follows:

One Copy:

U.S. Nuclear Regulatory Commission Division of Contracts Attn:

Mr. Craig D. Lebo, Contracting Officer Administrative Contracts Branch

+

Washington, DC 20555 l

U.S. Nuclear Regulatory Commission l

One Copy:

Office of the Executive Director for Operations Attn:

Mr. Patrick Rowe, DCS Project Officer Washington, DC 20555 i

1 i

l I

j_

TERA llDVMCED 5EnJgg LCRVRMm2 mgEncrumparemnw1mmw Contract No. NRC-10-78-580 Modification No. 20

- i i

C.

Consideration and Payment The contractor shall be reimbursed for all reasonable and allowable costs incurred for the services specified herein.

It is estimated that the total reimbursable cost to the Government for this PIPO effort will not exceed $86,331.50 which is established as the PIPO ceiling price.

Payment of reimbursable costs shall be made in accordance with Clause 65 of the General Provisions.

The contractor will receive a fixed fee of $ 6,000.00 which shall be paid upon satisfactory completion of this effort and submission of proper invoice or voucher.