ML20041B937

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 4 to Engineering Characteristics of Seismic Motion for Nuclear Power Plant Design. Contractor:Woodward-Clyde Consultants
ML20041B937
Person / Time
Issue date: 02/17/1982
From: Jacobs A
NRC OFFICE OF ADMINISTRATION (ADM)
To: Costello J, Forehand W
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20041B938 List:
References
CON-FIN-B-6680, CON-NRC-04-80-192, CON-NRC-4-80-192 NUDOCS 8202250422
Download: ML20041B937 (1)


Text

(101f,)

NRC-04-00-192 OlvlSION OF CONTR ACTS MODIFICAllON NUMBE R U.S. NUCLE AR REGUL ATORY CGMMISSION WASHINGTON. D.C. 20555 4

DNEW Q MODIFICAllON OTHE R L5pecitrl NOTIFICATION OF CONTRACT EXECUTION C N1R Ac1 BASED ON:

To:

William Forehand AUTHORIZ ATION NUMBE R g 7,,f,j RES-80-192

' Office of Nuclear Regulatory Research DATE

^ ' ' ' " ' ' ' ' ' " ',

1/6/82 l'

n 1 FROM:

/

[

b Inc bn ally add ds

/

tcontract s ci, il

/,,,;

p' w Rese4rch Contracts Branch Y

a-FE913 Jggg Ifly;i,"'

g

.~.

e DIVISION OF CONTRACTS, ADM fy 2/s\\ /

i;Q';,c CONTR ACTOR (Name & Location /

EXECUTION Dd'TE Woodward-Clyde Consultants 2/17/82 Three Embarcadero Center, Suite 700 TYPE C/ CONTR ACT San Francisco, CA 9411,1

'ost Reimbursement PROJECT TITLE PERIOD OF PERFORMANCE 9/30/80 - 1/30/83

,, Engineering Character 1zations of Seismic Motion for Nucle.ar Power PRINCIPAL INVESTIG ATOR Plant Design" Dr. I. M. Idriss NRC AUTHORIZED REPRESENTATIVE Dr. James Costello B&R NUMBER FIN NUMBER 60 19 21 B6680 AMOUNT NEW NRC FUNDS s 170,000.00 TOTAL FY.2 FUNDING S 170,000.00 0

665,000.00 TOTAL NRC OBLIGATIONS S

GOVERNMENT PROPERTY ATTACHMENTIS):

CONTR ACT DOCUMENT (

)

NRC FORM 255 110L 76)

)

.2 f'202250422 820217 o

PDR CONTR ACMD

  1. M

.T/ Zdd NRC-04-80-192 PDR s

,