ML20041B734
| ML20041B734 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 02/18/1982 |
| From: | Goodwin W WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8202250141 | |
| Download: ML20041B734 (1) | |
Text
_
. y(
e
'g I'; C.Q V g g
??~p n 1985 :
~
T
~a gEfd%[3rab t
-6 Westinghouse Electric Corporation t
Nxurueiomsion r
I ManufacturingDeartment y
'b 8
Draner R
/
Cc!umbia SouthCarohna 29205 g
'803 776 2610 February 18, 1982 Director of Inspection and Enf orcement
,U.
S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Subject:
SNM-1107/70-1151 The following report is issued in compliance with 10 CFR 40.65 and 10 CFR 70.59 " Effluent Monitoring Reporting Requirements".
For the six month period July 1, 1981 through December 31, 1981, the following quantities of radionuclides were released to the unre s tricted areas by the Westinghouse Electric Corporation's Columbia, South Carolina fuel fabrication plant:
A.
Gaseous 484.9 uCi Uranium (Analyzed as gross alpha)
B.
Liquid Effluent 54,935 uCi - U234 3,597 uCi - U235 17,751 uCi - U238 Gaseous results were obtained from point source analysis of stack gas effluent, and the individual radionuclide composition can be assumed to average the same as the liquid (72.5% U234, 4.7% U235, 22.7% U238)-
Liquid values were obtained by compositing proportional samples prior to discharge to the Congaree River.
Sinc e re ly,
WESTINGHOUSE ELECTRIC CORPORATION g,Aku e vt-W. L. Goodwin, Manager Regulatory Compliance WLF:lb WP0426:3 l
cc:
Director, Region II (2)
Director, M1PC (2) j U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Washington, D. C. 20555 Atlanta, Georgia 30303 8202250141 820218 O
PDR ADOCK 07001151 g
C PDR