DISTRIBUTION Docket ORB #1 Rdg g 0 219@
CParrish DWigginton Docket No.
50-295 fiemo File t'EMORAflDUff FOR: Steven A. Varga, Chief
/[
Y, Nf Operating Reactors Branch #1, DL
/
b E% ' p'.)
FROM:
David Wigginton, Project flanager
\\
Ope.*ating Reactors Branch #1, DL
\\
of
\\
g j
SUBJECT:
STENT GENERATOR 1B LEAKAGE AT ZI0'l STATION
- W This meno is to provide a chronology of the events to-date on the Zion Unit ~~
No. I steam generator 1B leakage and the Comonwealth Edison Company (Ceco) request for a technical specification change. As of today, the Zion Unit No. I has not violated any technical specification limit due to this problem.
We are continuing 'to follow the licensee's actions very closely and to develop whatever additional infomation might be benefic.ihl to a possible decision on technical specification changes.
Prior to January 20, 1982 - Lentine (CECO) has informed Wigginton of leakage buildup but does not appear to be a problem.
Prior to November 30, 1981 - OIE inspection reoort identified leakage and and no items of noncompliance.
Report received January 26,1982 in NRR.
January 20, 1982 - Telecon with Lentine on need for TS now rather than wait.
January 21, 1982 - Letter telecopied to NRR dated January 21, 1982 requesting deletion of 500 GPD limit.
- Telecopy of leakage data and graph from Lentine.
- Meeting with ORAB and MTEB to discuss proposed TS action.
January 22, 1952 - Telecon with Lentine and MTEB on ISI of pipes and valves on 1B steam generator line out to first isolation on all l
lines.
Ceco did visual leak check and all OVs.
- Telecon with Lentine and W.
W to discuss data with IREB and consider Zion S. G. iiispection to determine cause.
- Telecon with Lentine reporte<i 406 GPD.
January 22, 1982 - Telecon with R. ',fiener, L. Kofsey of ' DOE on.need for power.
DOE reports Chicago area short thru the weekend.
January 25, in32 - Ginna S. G. Tube Rupture, omcc) g202250082 B20202 goaaoocxosooog mo tac rosu ata oowpacu cuo OFFICIAL RECORD COPY usam e-mua
i Steven A. Varga January 27,1982 - Zion 2 down 3-7 days due to condenser tube leaks.
January 28, 1982 - Telecon with Lentine reports 4.6 G'PD and Ceco should have operators review the S. G. tube rupture E0P's.
- Telecon with J. Fif tchell, AEB on Zion TS for S. G.
tube break analysis but does not mention I.
- Telecon with R. lleiner/L. ifofsy on need for power.
DOE reports Chicago area short on reserves thru next week.
January 29, 1982 - Telecon with Lentine on TS for Iodine, NUREG-0651, y TS 3/4 4.9, and possible simulator run on D. G. tube break E0P.
As it now stands, the 1B steam ganerator is leaking below the Ts limit, the 1B steam line has been visually checked, the operators have been made aware of the problem, the licensee is looking at coolant activities to assess potential releases in the unlikey event of a S. G. tube break, '.f is working with Zion on the problem, and the Chicago area remains short on power
~
reserves to meet the peak requirements experienced this winter. Zion 1 is in compliance with their technical specifications even with the leakage.
ORIGIFO U David Wigginton, Project ffanager Operating Reactors Branch #1 Division of Licensing cc:
T. flovak ORAB ffTEB f
< >pt
)
Qff O
9-yd
- Prepiousconcurrenc ext page ORB #1 :DL*
RB' :
omes p sunswe)...W.1 1
99. 0.to 9,,
,,,S y.
.02131.8hds
.. /.... /....
oucy nac ronu aia 00-80) NRCM 0240 /
OFFICIAL RECORD COPY uscro. mi-mA
e Steven A. Varga January 27,1932 - Zion 2 down 3-7 days due to condenser tube leaks.
January 28, 1982 - Telecon with Lentine reports 416 GPD and Ceco should have operators review the S. G. tube rupture E0P's.
- Telecon with J. Mitchell, AEB on Zion TS for S. G.
tube break analysis but does not mention I.
- Telecon with R. liiener/L. Hofsy on need for power.
x DOE reports Chicago area short on reserves thru next
\\ ' week.
\\
January 29, 1932 - Telecon with Lentine on TS for Iodine, NUREG-0651, y
\\TS 3/4 4.9, and possible simulator run on S. G. tube bt eak E0P.
As it now stands, the IB steam generator is leaking below the TS limit, the IB steam line has been visually checked, the operators have been made aware of the problen, the licensee is looking at coolant activities to assess potential releases % a S. G tube brea uen't ew &L it to),
E is working with Zion on the problen, 3h ((sud uc and the Chicago area remains short on power reserves to meet the peak requirenents experienced this winter. Zion 1 is in compliance with their technical specifications even withtthe leakage.
I h
,h David Wigginton, Project l'anager
,,y 91 F^
Operating Reactors Branch #1 Division of Licensing cc:
T. ?!ovak ORAB MTEB
\\
\\
N
\\
'N s
I h\\
ORB #1,;.k)
ORB #1,;,DL,,
omce>
sunwuc k.Dl.iSS.intan....SVarp 02LYL8.b.dS. 02L...]B2..
oney Nac roRM 318 00-80) NRCM Cm OFFICIAL RECORD COPY usa m.im - m e.