ML20041B604
| ML20041B604 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/15/1982 |
| From: | Robin B AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| NUDOCS 8202240342 | |
| Download: ML20041B604 (1) | |
Text
a
'-T L e
VLI:1 sty
( h D'
w
' ry
,' 1982
(
Uttice of the Secretary
'Q gry 7 2 g' $.
U.S.
Nuclear 14equlatory Commission
~~
Washington, D.C.
20555 ccc;r
,7.h.h.
PROD. E UY!L 1 C.,
He: Docket No. 50-2e9
Dear NitC:
As a Pennsylvan13 resident wno lives downwind trom Three Mlle Islanc, 1 protest the decision oy the Atomic Safety and Licensing ooard anien recommends tnat Metropolitan Edison Co. De allowed to restart reactor No. 1 at IM1.
I believe there are g reasons any restart ot IM1-1 should not be permitted et this timet
[M A method of paying for tne cledn-up of IM1-2 nas n Nh even Deen agreed to and the clean-up itself nas ndrdly Deg The clean-up is an entirely new process, dnd who Knows wh h,
.\\
k!
$-h proolems may arise. I believe tne cledn-up or TM1-2 snou e Q (q.'dA Y LI substantidlly complete before anotner reactor -- TM1-1 s
dllowed to operate on the salle site.
2 k;
n h
fr SUf.D x Ay Tne invest 19dtion ot cnedting on qualification ests gg*yct by reactor operators at TMI has not oeen completed. Certa y
'O' this snould be entirely cleared up betore any reactor is Op e
dllowed to operate dt Thl.
hV Ine courts nave not nad a chance to rule on the issue of the psychological stress unicn a restart would cause tor residents in the immeciate vicinity ot 1M1. They nave a right to be neard before Met-Ld and the NHC pre-empt their case.
_ An adequate evacudtion plan tor tne ENTlRE nazdro dIea around IMI ha$ yet to De prepdred and acceptea. 1his must include at least d 25-mile Iddlus.
I also reject the ASLB contention tnat Met-t;d and GPU Nuclear are qualitied to operate a nucledr redctor. They told tnen covered it up wnile it us
- e're supposeo to believe them when tney was nappening.
no noa say it don't happen again?
go3 I urge tne Nuclear Requidtory Commission to reject the ASLB recommendation. Please order that IM1-1 remain closea until ALL
/ C) of the above proolems are resolved.
8202240342 820215 PDR ADOCK 05000289 E
H PDR Sincerely,
,M ".
cd$o '
wSC hr 3aY h r k.crtno~-
A
'r
,c mp A
k.0 b
Ar%d4 h6W as a-e LWrw wwm Pa.
m 39 n