ML20041B406
| ML20041B406 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/09/1982 |
| From: | Sargent C COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| REF-PT21-82-560-000 10CFR-50.55E, 3431N, PT21-82-560, PT21-82-560-000, NUDOCS 8202230613 | |
| Download: ML20041B406 (2) | |
Text
e
~
M ~ N. Commonwealth Edison
) one First National Platt Chiergo. tilinois J
O Address Reply to: Post Office Box 767 Chicago; tilinois 60690 I
i February 9, 1982
- t..
Mr. James G. Keppler, Regional Administrato N
Directorate of Inspection and-
//
Enforcement - Region III RECEng
- U.S. Nuclear Regulatory Commission 799 Roosevelt Road k
FEB00 08236
"$[$"7$3f:g
~
Glen Ellyn, IL 60137 6
"X
Subject:
LaSalle County Station Un sfly nd{b Crosby SRV Solenoid Valves 50.55(e) Final Report #81-06 NRC Docket Nos. 50-373 and. 50-374 Reference (a):
C. E. Sargent letter to J. G.
Keppler dated December 15, 1981.
(b):
C. E. Sargent letter to J. G.
Keppler dated November 19, 1981.
Dear Mr. Keppler:
The purpose of this letter is to provide the status of the Crosby SRV Solenoid Valve 10 CFR 50.55(e) report as committed to in Re ference (a).
As described in Reference (b), the final resolution to the Crosby Solenoid Valve qualification problem was pursued in parallel paths; one included replacement o f the collet / yoke assembly and the other was to provide a qualified Crosby Solenoid.
The qualification of the Crosby Solenoid has been completed and since this is considered to be the long term solution, the following installation schedule has been established:
Unit 1 - ADS-SRV's - prior to fuel load Unit 1 - Remaining SRV's - prior to Unit startup Unit 2 - All SRV's - prior to fuel load All SRV Solenoids have had the qualified collet / yoke assem-bly installed in them.
This modification and the manufacturer's testing to IEE 323 (1971) standards qualifies these valves for plant operation until further testing to NUREG 0588 requirements is com-pleted under Commonwealth Edison Company's Equipment Qualification program.
g/1 8202230613 820209 FEB 14 PDR ADOCK 05000373 S
o J. G.
Keppler Februa ry 9, 1982 If there are any further questions in this regard, please contact this office.
Very truly yours, C. E. Sa rgent Nuclear Licensing Administrator 1m cc:
Director of Inspection and Enforcement - Washington, D.C.
Region III Inspector - LSCS 3431N l