ML20041B387
| ML20041B387 | |
| Person / Time | |
|---|---|
| Issue date: | 01/22/1982 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Brunner R SQUARE D CO., ELECTROMAGNETIC INDUSTRIES |
| Shared Package | |
| ML20041B388 | List: |
| References | |
| REF-QA-99900367 NUDOCS 8202230596 | |
| Download: ML20041B387 (3) | |
Text
-
IN
,jp; 2 2 Docket No. 99900367/81-01 m
w
,ps 4
s RECEIVED q
z.
Square D Company j
FEB 2219827-Power Equipment Division a
ATTH: 11r. R. H. Brunner n%,xmann I
Plant !!anager 5
252 North Tippecanoe 4
6 Peru, IN 46970 a
g Gentlemen:
This refers to the inspection conducted by Mr. W. E. Foster of this office on flovenber 30-December 4,1981, of your facilities at Peru, Indiana, associated with the manufacture and fabrication of motor control centers, panel boards, and switchboards and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
This inspection was made as a result of written notification of the following problens:
(1) improperly crimped terminal lugs, inproperly tightened screws on devices and terminal blocks, and excessively bent ter-ninal lugs on 480 volt notor control centers that have been furnished to the Shoreham Nuclear Power Station, Unit No.1; (2) lubricant 'n rubber bumpers of NEMA Size 3 starters in 480 volt motor control centers that have been furnished to the Shorehan Nuclear Power Station, Unit No.1; and (3) pinched wires in 480 volt notor control centers that have been furnished to the V. C. Summer Nuclear Power Station, Unit No.1.
Additionally, the following areas were inspected: (1) inplementation of 10 CFR Part 21; (2) follow up on previoucly identified nonconformances; (3) follow up on previously identified unresolved items; and (4) change control.
Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During the inspection it was found that the imple.aentation of your QA program failed to meet certain NRC requirements. The specific findings and refer-ences to the pertinent requirenents are identified in the enclosures to this letter.
8202230596 820122
/ [t
/
PDR GA999 ENVSGUAR 1b f j/
99900367 poR y
RIV j N
)
omce > 'trinh *
"giurr'
- Rivis"d"
' bra.
~ "'" ' " '
WEFos'ter/rf "IB3rnes-UPo' tap'ovs" *
"JEGa i' ard'o l' lins"
">.12/.30/.al.,
..F//M./.at...4/.MI.W.....)2h)g/8,k,,
,,1 U,W, NRC FORM 318110 80) N R C M O2 4 d OFFICIAL RECORD COPY
I Square D Company Power Equipment Division Please provide us within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.
The response requested by this letter is not subject to the clearance proce-dures of the Office of Management and Budget as required by the Papemork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt fron disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file request for withholding; and (b) submit within 25 days from the date of this letter a written applica-tion to this office to withhold such infomation.
If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the informa-tion which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
"""^"'>
onn )
OFFICIAL RECORD COPY L ""C '
e r
Square D Company Power Equipment Division Should you have any questions concerning this inspection, we will be pleased to discuss them with you, t
Sincerely, Uldis Potapovs. Chief Vendor Inspection Branch cc: Square D Company ATTN: Mr. P. R. Goudy Vice President, Engineering i
Executive Plaza l
Palatine, Illinois 60067
Enclosures:
1.
Appendix A - Notice of Nonconfonnance 2.
Appendix B - Inspection Report No. 99900367/81-01 3.
Appendix C - Inspection Data Sheets (8 pages) 1
- "'c'>
.......... ~... ~
. ~...... -.....
-..-..~.-
OURNOMEk DATEk noc ronu si.. io..oi naca oz*
OFFICIAL RECORD COPY j
.