Text
9 Appendix NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-295 Docket No. 50-304 As a result of the inspection conducted on January 18-19, 1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:
10 CFR 30.41(c) states, in part, that before transferring byproduct material to a specific licensee of an Agreement State, the licensee transferring the material shall verify that the transferee's license authorizes the receipt of the type, form, and quantity of byproduct material to be transferred.
Contrary to the above, the licensee made two shipments of byproduct material to an Agreement State licensee without first verifying if their license authorized receipt.
This is a Severity Level VI violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full com-pliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Consideration may be given to extending your response time for good cause shown.
FEB 3y e i. p g [; g y 6 g,.g g i c
Dated C. E. Norelius; Director Division of Engineering and Technical Inrpection 8202230516 820203 PDR ADOCK 05000295 O