ML20041B231
| ML20041B231 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/11/1982 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8202230411 | |
| Download: ML20041B231 (1) | |
Text
PRIE'CIPAL STAFF e/ DIR N
MIF 3/D PA 0 __
l A/n sto ORSPI Wisconsin Electnc eom couem omi rf -/-[ /.~eg kgj 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 ytic February 11, 1982 Mr. J. G. Keppler, Regional
[
q,,
Administrator Office of Inspection and Enforcemen k.s
/b Region III
]
g%2:!/SD
~
T33 U. S. NUCLEAR REGULATORY COMMISSIO14 L N~ c g IOO2A [
799 Roosevelt Road mdf}I [fg4 Glen Ellyn, Illinois 60137 6g /W{ic' gN
Dear Mr. Keppler:
DOCKET NOS. 50-266 A 1
PROMPT NOTIFICATION SYSTEM POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In accordance with 10 CFR 50, Appendix E, and NUREG-0654, Revision 1, a prompt notification system as described _in our letter to Mr. H. R. Denton of December 16, 1981 has been installed and tested.
The test was completed on January 30, 1982.
After some initial delay due to problems with a telemetry system, full operation of the prompt notification system was achieved at 1:48 p.m. on January 30, 1982.
The difficulties with the tele-metry system and a procedure were noted and have been corrected.
In a subsequent retest on February 6, 1982, a receiver malfunction occurred and is being remedied currently.
A schedule of routine monthly testing has been implemented.
Very truly yours, l
o' Asttistant Vice President C.W.
Fay Copy to NRC Resident Inspector 8202230411 820211
[~
PDR ADOCK 05000266 g
F PDR FEB 16 1982 f3