V

>l i

APPENDIX B NOTICE OF DEVIATION Long Island Lighting Conpany Docket No. 50-322 S!'oreham Nuclear Power Station License No. CPPR-95 Basec! on the results of the inspection conducted on January 1 - 31, 1982, i t appears that one of your activities was not conducted in accordance with commitments made to the NRC as indicated below:

The Shoreham FSAR, paragraph 4.4.6 states that the loose parts monitorinq system meets the requirements of Regulatory Guide 1.133.

1.

Regulatory Guide 1.133, paragraph C.I.c specifies that instrument channels be physically separated where inaccessible during full power operation.

Contrary to that requirement, as of January 13, 1982, instrument cables for different channels were not physically separated inside the drywell (which is inaccessible during fu11 power operation) in that they were run in the same conduits and they utilized the same electrical penetration.

2.

Regulatory Guide 1.133, paragraph C.1.d specifies that an audible or visual alarm should alert control room personnel when the alert level is reached.

Contrary to that requirement by system design, as of January 13, 1982, there was no alarm or annunciator from the loose parts monitoring panel to audibly or visually alert control room personnel that the alert level had been reached.

0202230293 820202 DR ADOCK 05000 i