Summary of 820107 Meeting W/Util Re Licensee Performance, Integrated Assessment & Status of All Topics
ML20041A862
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 01/29/1982
From: Brown S, Persinko D
Office of Nuclear Reactor Regulation
To: Russell W
Office of Nuclear Reactor Regulation
References
NUDOCS 8202220599
Download: ML20041A862 (4)


Text

--

j[#

o,,

UNITED STATES g

NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 g-January 29, 1982 o,s

/

.- g x y ff W MEMORANDUM FOR: William T. Russell, Chief Systematic Evaluation Program Branch, DL THRU:

Robert A. Hermann, Section Leader, Engineering Sectio Systematic Evaluation Program Branch, DL t

FROM:

Drew Persinko, Integrated Assessment Project Engineer (Millstone)

Stewart Brown, Integrated Assessment Project Manager (Haddam Neck)

Systematic Evaluation Program Branch, DL

SUBJECT:

SUMMARY

OF MEETING HELD ON JANUARY 7,1982 WITH NORTHEAST UTILITIES.(MILLSTONE 1 AND HADDAM NECK)

RE:

INTEGRATED ASSESSMENT As a result of the December 17, 1981, meeting held to discuss licensee performance regarding the Systematic Evaluation Program, Northeast Utilities met with the NRC staff on January 7,1982, to discuss the -

Integrated Assessment on Millstone 1 and Haddam Neck and the status of all topics for these plants. A list of attendees is attached.

During the morning session, the conduct of the Integrated Assessments on both plants was discussed.

Northeast Utilities proposed performing the Integrated Assessments on both plants with NRC staff assistance, A number of considerations relating to this concept were discussed such as time frame necessary to complete the Intearated Assessments, avail-ability of NRC staff to discuss individual SEP topics, availability of NRC staff at Northeast Utilities' facilities to assist in preparation of the Integrated Assessments, and use of NU's in-house PRA capability, The staff stated that the Integrated Assessment is not a PRA; however, PRA procedures should be viewed as a tool and could be used in specific i

instances to aYsist in conducting the Integrated Assessments.

Northeast Utilities agreed to submit to the staff by January 31, 1982, a letter containing a commitment and schedule for completion of licensee SARs and other outstanding issues on topics and a proposed method and schedule specifying how and when the licensee would perform an Integrated

+

Assessment on their plants, In the afternoon, each SEP topic was reviewed on both Millstone 1 and Haddam Neck. This assured mutual agreement of current topic status, 8202220599 820129

~"

PDR ADOCK 05000213 P

ppg

5 William T. Russell The licensee said that all outstanding SARs on both plants will be submitted to the staff by January 31, 1982. Schedules for responses to staff questions on licensee SARs and staff or contractor performed SERs were determined.

l gsgr.lAAA L TO l

l Drew Persinko, Integrated Assessment 1

Project Engineer (Millstone)

Systematic Evaluation Program Branch Division of Licensing

,/ -

.;{.

t

.,:.~. c -

Stewart Brown, Integrated Assessment Project Manager (Haddam Neck)

Systematic Evaluation Program Branch Division of Licensing

Enclosure:

Attendance List I

i

_______._m

. -.. n e

ENCLOSURE NORTHEAST UTILITIES (MILLSTONE AND HADDAM NECK) MEETING 1/7/82 Attendance List Morning Session i

G.:Lainas NRC R. Hermann NRC S. Brown NRC D. Persinko NRC J. Shea NRC C. Tropf NRC J. Villadoniga NRC R. Kacich NU M. Bain NU R. Schaffstall

. KMC Afternoon Session R. Hermann NRC S. Brown NRC D. Persinko NRC C. Tropf NRC J. Villadoniga NRC M. Bain NU h

i

.o January 29, 1982 MEETING

SUMMARY

DISTRIBUTION

~

Dockets:

50-213 NRC PDR Local PDR SEPB Reading TERA Central Files H. Denton E. Case L. Shao D. Eisenhut R. Purple R. Vollmer T. Novak S. Varga T. Ippolito R. Clark R. Tedesco

11L, s

J. Youngblood

' s_

N A. Schwencer F. Miraglia

%f; 3

l J. Miller

(

' J.3 if pg00 JZ I

G. Lainas asefjjpyp,fogO'N / f/

y D. Crutchfield

{

e T. Ippolito 7,gwu,7!r s

)

D NSIC Receptionist (Phillips Building)

NRC Participants :

R. Hermann S. Brown D. Persinko J. Shea C. Tropf J. Villadoniga R. Schaffstall, KMC R. Kacich, NU M. Bain, NU Millstone 1 - cc list Haddam Neck - cc list

.y,

--. +

Mr. W. G. Counsil (Haddam Neck and Millstone) cc William H. Cuddy, Esquire Connecticut Energy Agency Day, Berry & Howard

' ATTN : Assistant Director Counselors. at Law Research and Policy One Constitution Plaza Development Hgrtford, Connecticut 06103 Department of Planning and Energy Policy Board of Selectmen 20 Grand Street Town Hall Hartford, Connecticut 06105 Haddam, Connecticut 06103 Resident Inspector Northeast Nuclear Energy Company Haddam Neck Nuclear Power Station ATTN: Superintendent c/o U. S. NRC Millstone Plant East Haddam Post Office P. O. Box 128 East Haddam, Connecticut 06423 Waterford, Connecticut 06385.

U. S. Environmental Protection Natural Resources Defense Council Agency 917 15th Street, N. W.

Region I Office Washington, D. C.

20005 ATTN: Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector c/o V. S. NRC Superintendent P. O. Box Drawer KK Haddam Neck Plant Niantic, Connecticut 06357 RFD #1 Post Office Box 127E Waterford Public Library East Hampton, Connecticut

  • 06424 Rope Ferry Road, Route 156 Waterford, Connecticut 06385 Ronald C. Haynes, Regional Administrator Nuclear Regulatory Commission, Region I First Selectman of the Town Office of Inspection and Enforcement of Waterford 631 Park Avenue Hall of Records King of Prussia,' Pennsylvania 19406 200 Boston Post Road Waterford, Connecticut 06385 John F. Opeka Systems Superintendent Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Mr. Richard T. Laudenat Manager, Generation Facilities Licensing-Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 e