.'r-OPERATING DATA REPORT a
DOCKET NO.
50-263_____.
DATE 2-d-82___
C0tiPLETED bY A.
L.
Myrab.
TELEPHONE 612/295-515-OPERATING STA.TUS l Notes 1.
Unit Name
_____________________.___Monticelto l
2.
Reporting period: _ _____
_ ___ ___ JANUARY I
3.
Licensed Theru.aL Power (MWt)
_________ _1670 l
4.
Nameplate Rating (Grors MWe)-
______..______569 l
5.
Design Electrical Rating (Net MWe)- ___ _545.4 1
6.
Maximum Dependable Capacity (Gross MWe)
__553 l
7.
Maximum Dependable Capacity (Net MWe)
_ __ _5 2 5 -
l__________________________
G.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __ Maximum Dependable Capacity Reduced 11 MWe due_.
__to removal of 1.ith stage low pressure t urb ine b lades (items 6 & 7)___.
9.
Power Level To Which Restricted, If Any (Net hWe)'
___N/A________________..__
- 10. Reasons For Restrictions, If Any:
__N/A____________________________________.
This Month Yr.-to-Date Cumulativt
- 11. Hours In Reporting Period
_____744
_____ 744
____ 9283:
- 12. Number Of Hours Reactor Was Cr i t ica L
___394.3
___ 394.3
__ 75329.'
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.
i
- 14. Hours Generatar On-Line
___343.7
___ 343.7
__ 73553.-
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.t
- 16. Gross Thermal Energy Generated (MWH)
_ 526661 526661
_12020900;
- 17. Gross Electr ica L Energy Generated (MWH)
_176642
__ 176642
__38182014
- 10. Net Elec tr ica L Energy Generated (MWH)
__168030
__ 168030
__3651155:
- 19. Unit Service Factor
__ 46.2%
___ 46.2%
__ __ 79. 2:
- 20. Unit Availability Factor
__ 46.2%
___ 46.2%
____ 79. 2:
- 21. Unit Capacity Factor (Using HDC Net)
__ 43.0%
___ 43.0%
____ 74.9:
- 22. Unit Capacity Factor (Using DER Net)
__ 42.3%
___ 42.3%
____ 73. 6:
- 23. Unit Forced Outage Rate 4.8%
4.8%
6.i:
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
__ September 4, 1982 - Refueling Outage - 45 days _____._____..___________
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:___N/A_____
- 26. Units In Test Status (Prior to Commercial Operation)- N/A Forecast Achieve INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIriL GPERATION 8202190299 820215 PDR ADOCK 05000263 R
('
AVERAGE. DAILY. UNIT POWER LEVEL DOCKCT NO.
50-263____ _
UNIT HonticelLo _
DATL 2-3-82 ___
CUMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151
-MONTH ____ _-JANUARY DAY AVERAGE DAILY POWER LEVEL
, DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-
(MWe-Net) i
-4____________
17 15____________
9
-3__._
18
____227_
3
-4____________
19
__________495____________
4.
-4____________
20
__.________523____________
5
~4 __.___.______
21
_ _ _ _5 2 8_ _ _ _._ _ _ _ _ _.
6
-4___.____._
22
_ _ _ _._ _ _ _5 2 ~7 _ _ _ _ _ _ _._
7
__.________-4___.____._
23
_53'_
a 8
_ _ _. _ -4 ____ ___._ _
24
_ _494._ _______
9
_.__.__--4__._____._
25
___.__5ii__
I.
10
___.__.___._-3____.__.___.
26-
___513 __.______.__
4 l
l i1
-4____
9_7
__-__528______.__-___
i 5
12
-4____
28
__.___545
'13
____.____.__.-4_____._
29
_____540___
14
-5_____.__._
30
__._._._.538_
'15
'.i_______.._.
31
_ __534_
16
-5____________
[
INSTRUCTIONS On this format, List the average daity unit power level in MWe-Net for each i day in the reporting month.
Compute to the nearest whole megawatt.
i l
4 4
-.. mea.
ww.e.
.~..e.---
,* j NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCI'ET NO.
50-263______
DATE 2-3-82____
COMPLETED DY A. L. Myrabc TELEPHONE 612/295-5151 MONTH ______ JANUARY 1-1-82 to Continuation of 1981 FALL Inaintenance outage.
.1-15 1-16-82 Reactor critical.
Generator on-Line for warm-up run.
1-17-82 Generator off-line for turbine overspeed test.
1-i7-82 Generator on-Line. -Generator off-Line for inspection of turbine bearing.
1-18-82 to Generator.on-Line.
Power ope,ation.
1-31-82 l
l l
Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
s O '~
y.
V UNITSilUTDOWNS \\ND POWER T EDUCTIONS DOCKET NO.50-263-UNIT N AME ' iDnticello.
DATE -M*
REPORT \\1ONT!! January COMPLETED BY _ A. Myrabo -
TELEPHONE - 612/295-5151 E
=
es u, -
c 3
1 y
7 - f La.cernee 5*
g 9.,
Cause & Correctne L
Dat e 25
.3.
- ~
Esent 27 c.?
- Atijon to 3E
- s jfg Report =
n'
,5 ~~
. Present Recurrence -
v
_2_
16('81) 1-1-32 S
381.7 B
1 N/A ZZZZ ZZZZZZ Continuation of 1981 Itall.'laintenance outage 1
1-17-82 S
1.2 B
1-N/A IIA
'IURBIN Generator off-line for turbine over-speed test 2
1-17-82 F
17.4 II 1
N/A IIA
'IURBIN Generator off-line 'for inspection of -
- 9 bearing
{
I 3
'4 F: Forced Reason; Method:
Eslubit G -Instructions S. Schedufed A.Ega:pment Failure (Explaint
! Manual for Preparation of Data Balaintenance of Test 12 Manual Scram.
Entr> Sheets for Licensee C. Refueling 3 Autom.itie Scram.
Esent Report (LER) File (Nt' REG-D Reculatory Restriction 4-Other ( Explain i :
.0161)
E-Operator Training & License Esamination.
F-Adr:-inistrative
.5 G-Operational Er ror ( E xplaia l Eshibit 1 Same Source (9/77)
Il-O:her i Esplain) a, ',