Suppl to BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.25 Effect of Loss of AC Power on Pump Seals. Endorses Position.No Mods Planned
ML20041A178
Person / Time
Site: Pilgrim
Issue date: 02/10/1982
From: Deacon W
BOSTON EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.25, TASK-TM 82-47, NUDOCS 8202190222
Download: ML20041A178 (2)


Text

.

fp

  • q

/ g, eDaTON EDISDN COMPANY

.oo son. s,.or

%[J h* BoeTON. MAmeACHustTTs 02199 FEB1 D IS

(-- j ,ggs g February 10, 1982 Q BECo. Ltr. #82- 47 7G ..

Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 License No. DPR-35 Docket No. 50-293 References : (a) Letter D. B. Waters (BWR Owners Group) to D. G. Eisenhut (NRC) titled "BWR Owners Group Evaluation of NUREG 0737 Requirement II.K.3.25" dated May 22, 1981 (b) Letter A. V. Morisi (BECo) to D. G.

Eisenhut (NRC) dated August 20, 1981 (c) Letter T. J. Dente (BWR Owners Group) to D. G. Eisenhut (NRC) titled " Supplement to BWR Owners Group Evaluation of NUREG 0737 Requirement II.K.3.25" dated September 21, 1981 Supplement to BWR Owners Group Evaluation

. of NUREG 0737 Item II.K.3.25 "Effect of Loss of A.C. Power on Pump Seals"

Dear Sir:

Reference (a) submitted the generic BWR Owners ~ Group position on NUREG 0737 Item II.K.3.25 "Effect of Loss of Alternating Current Power on Pump Seals". Boston Edison Company (BECo) endorsed this position in our Reference (b) response and stated that no modifications related to this item were planned for Pilgrim Nuclear Power Station (PNPS).

I

Supplemental information to the BWR Owners Group evaluation.of NUREG 0737 Item II.K.3.25 was transmitted to the NRC in Reference (c). Boston Edison Company has reviewed this supplemental informhtion and has determined that the test results from Byron Jackson apply to PNPS, based on the similarity of pumps, to those at PHPS. Two tests were conducted on Byron Jackson pumps and both showed that seal leakage is acceptable even with the loss of seal cooling.

l Oh 1'64

  1. 88"17e!!2ggggg P PDR

. 'CESETON. Ekl2DN COMPANY Mr.' Darrell G. Eisenhut,- Director

' February 10, 1982

-Page 2' 1

BECo therefore reiterates its position by endorsing the' BWR Owners' Group i position on NUREG-0737,-Item II.K.3.25, and plans no modifications related j . to this'. item for Pilgrim Nuclear Power. Station (PNPS).

We trust' this letter is. responsive to 'your requirements; however, should you desire additional information or clarification, please feel free lto-contact us.

1 Very truly yours, i

f(/W. H. Deacon Nicc%t

' Acting Manager, Nuclear Operations Support 4