ML20041A068

From kanterella
Jump to navigation Jump to search
Opposes Facility Licensing Because Westinghouse Reactors Cause Numerous Problems,No Workable Evacuation Plan Exists, Waste Problem Not Solved,Radiation Is Dangerous,Conservation Is Working & Alternate Energy Sources Are Less Costly
ML20041A068
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/28/1981
From: Denton D
AFFILIATION NOT ASSIGNED
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20041A057 List:
References
RTR-NUREG-0813, RTR-NUREG-813 NUDOCS 8202190044
Download: ML20041A068 (1)


Text

5 C0 06 e

4-022408S332 11/28/81 ICS'IPMBNGE CSP CGBB 3147761412 HGM TDBN ST LOUIS HD 159 11-28 0843P EST.

/ PRINCIPAL STAFP kDIR I

(,

E&Is t 3/D' PAO

-4/D hi.0

(

E C0 MR JAMES KEPPLER NRC DIRECTOR REGION III 2R&PI HUREG 0813799 L

ROOSEVELT ROAD 33377 L

GLE4 ALLEN IL 60137

3EP&OS File l

C 1

e--

F C

I AM GPPOSED TO THE CALLOWAY COUNTY NUCLEAR PLANT FOR

{

REASONEi THE-FOLLOWING

(

l USING A' WESTINGHOUSE REACTOR WHICH HAS THE POOREST RECORD OF ALL l

EXISTING REACTORS WILL CAUSE NUMEROUS SERIOUS AND EXPENSIVE PROBLEMS, I

THERE'IS NO WORKiBLE EVACUATION PLAN FOR THE AREA. THE WASTE PROBLEM

(.

~

l HAS NOT BEEN SOLVED IN OVER 25 YEARS WHY GENERATE MORE. ANY RADIATION OV'ER BACKGROUND IS DANGEROUS TO LIFE. THIS PLANT WILL BE RELIEVING SOME DAILY INTO THE WATER AND AIR, WE JUST HAD BACK TO BACK THE

(

HOTIEST SUMMER AND COLDEST WINTER ON RECORD AND DID NOT HAVE EVEN A BROANBUT. POPULATION IS DOWN C.ONSERV ATION IS-h0RKING. SOL AR, AND OTHER ALTERNATIVES ARE LESS COSTLY. FOR A SO CALLED INEXPENSIVE ENERGY I

S O U R' C E NUCLEAR IS THE MOST COSTLY TO BUILD MAINTAIN AND DISMANTLE. I STRONGLf URGE YOU NOT TO LICENSE THIS PLANT, DOROTHY DENTON 3818 PENNSYLVANIA ST LOUIS HD 63116 I

20: 46 EST HGHC_OMP

(

C (l

(

( !

4 8202190044 820201

(

DR ADOCK 05000 g 3Q $$

TO REPLY BY MAILGRAM. SEE REVERSE SIDE FOR WESTERN UNION'S TOLL - FREE PHONE NUMBERS