ML20040H021
| ML20040H021 | |
| Person / Time | |
|---|---|
| Issue date: | 01/26/1982 |
| From: | Haass W Office of Nuclear Reactor Regulation |
| To: | Peshek C AMERICAN INSTITUTE OF STEEL CONSTRUCTION, INC. |
| References | |
| NUDOCS 8202170012 | |
| Download: ML20040H021 (1) | |
Text
a
s a
DISTRIBUTION:
JAh 2 6 002
~ Central File RGN 1 NRC PDR RGN 2 LPDR RGN 3 NSIC RGN 4 m
Mr. Charles Peshek, Jr.
QAB Projects RGN 5
'o a
fj Director of Quality Certification QAB Chron. File SD 3
American Institute of Steel Construction. Inc. JSpraul, QAB gElVE:D IE t
File 400 North flichigan Avenue Chicago, IL 60611 RES AL (16732 yI-RL gsvaktmo 7902.s l -
hIf((2 [9
Dear Mr. Peshek:
N o
SUBJECT:
NRC ACCEPTA' ICE OF REV.10F AISC TOPICAL REPORT (FCTPN-78)
/4
.[,
s In your letter dated December 18, 1981, you submitted a proposed revision to the AISC topical report, " Quality Assurance for AISC Nuclear Quality Certifica-tion Program." The principal purpose of the revision is to clarify the design responsibilities of the owner (or his engineer) and of the fabricator. This was done by n! vising the introduction and adding requirements under Item No.
3.0, " Design," to the Nuclear Certification Program Evaluation / Audit Checklist.
Other changes address the delegation of your authority, correction of a print-ing error, and clarification that your operation is audited by two members of the AISC Task Comnittee on Quality Certification and not by the AISC Board Commi ttee.
Based on our evaluation of the changes proposed in your December 18,1981, let-ter, we find that the proposed revision is acceptable with the following condi-tions which we discussed during previous telephone conversations.
1.
Add the following sentence at the end of the revised last paragraph of Section I: "This approval also indicates completion of an independent verification of the adequacy of the shop detail drawings in accordance with Criterion III of Appendix B to 10 CFR Part 50."
2.
Add the following words to the last sentence of Section III.D.1: ", an d j
the nuclear quality assurance program requirements supplement (i.e., do not replace) the Category I or Category II quality assurance program requirements. "
l 3.
Add "Section X, Reference" to the topical report and include therein the AISC Code of Standard Practice for Steel Buildings and Bridges.
Please incorporate the revision, the reference, and this letter into the topical report and fonvard 20 copies to the NRC.
Should you have any questions regard-ing our review or if we can provide assistance, please contact Mr. Jack Spraul l
on (301) 492-949S.
T/
Sincerely,
'h r252170012 820126 h
PDR MISC Original signed by gf PDR Walter P. Haass 4
,i Walter P. Ilaass, Chief o,,,co d.(..AMB,,,,,,, /g :/-
Quality As'surance Branch l
Division o'f Engineering - - - - - - -
LLo
. JSnau,1.:,cs.,
,,[!,P,,R,,,,a,,,s,,,,,,
l
...us82
.mp.82......
%rowaiso m acuoua OFFIClAL RECORD COPY mcm mi--me
]