_ TOPICAL REPORT EVALUATION Report Number:

CP C-2 Report

Title:

Quality Assurance Program Description for Operational Nuclear-Power Plants Report Date: November 20, 1981 Originating Organization: Consumers Power Company Reviewed By: Quality Assurance Branch SUMARY OF TOPICAL REPORT Topical' Report CPC-2 describes the quality assurance (QA) program which Consumers Power Company (CPC) applies to those operational phase activities involving safety-related structures, systems, and components of nuclear power plants within the CPC scope of work.

CPC-2 commits CPC to comply with the requirements of Appendix B to 10 CFR Part 50 and to follow the regulatory position provided by the NRC in i

Regulatory Guides 1.8-Proposed Revision 2 (September 1980), 1.26-Revision 3 (February 1976), 1.29-Revision 3 (September 1978), 1.30 (August 11,1972),1.33-Revision 2 (February 1978),1.37 (March 16,1973),1.38-Revision 2 (May 1977),

1.39-Revision 2 (September 1977),1.58-Revision 1 (September 1980),1.64-Revision 2 (June 1976),1.74 (February 1974), 1.88-Revision 2 (October 1976), 1.94-Revi-sion 1 ( April 1976),1.116 (May 1977),1.123-Revision 1 (July 1977),1.144-Revi-sion 1 (September 1980), and 1.146 ( August 1980) as documented in Appendix A, Part 2 in the report.

CPC has provided for our evaluation a detailed organizational description of those individuals and groups involved in carrying out activities required by the QA program and a delineation of duties, responsibilities, and authority of those organizational elements involved in the QA program.

CPC-2 contains a descrip-tion of the measures used to carry out the CPC QA program activities and describes how applicable requirements of Apperdix B to 10 CFR Part 50 will be satisfied by.

the administration and imp'lementation of these measures.

SUP94ARY OF REGULATORY EVALUATION AND POSITION We have evaluated the QA program and the organizations responsible for QA func-tions as described in CPC-2. We find that QA policy and direction originate at an acceptably high management level and are effectively ccmmunicated to other parts of the organization.

Individuals performing QA functions have responsi-bility and authority commensurate with their duties in implementing the QA pro-g ram. We also find that measures have been established to be implemented by written procedures and instructions which address each of the criteria of Appen-dix B to 10 CFR Part 50 in an acceptable manner.

Based on our review and evaluation of CPC-2, we conclude that:

1.

The organizations and persons performing QA functions within CPC have the required independence and authority to effectively carry nut the QA program without undue influence from those directly responsible for costs and schedules.

I f>

R E

C PDR

t 2.

The CPC QA program contains requirements and controls which, when properly implemented, comply with the requirements of Appendix B to 10 CFR.Part 50.

3.

The CPC topical report, CPC-2, " Quality Assurance Program Description for Operational Nuticar Power Plants " is acceptable for use in the operations phase activities of CPC's nuclear power plants.,

S.

J