ML20040G331

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1982
ML20040G331
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/05/1982
From: Graesser K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20040G332 List:
References
NUDOCS 8202120176
Download: ML20040G331 (1)


Text

k Commonwe lth Edison Zion Generating Station Shiloh Blvd. & Lake Michigan Zion,Ilknois 60099 Telephone 312/746-2084 February 5, 1982 Director, Office of Inspection N

4 and Enforcement

//

U.S. Nuclear Regulatory Commission REOEIVED 3

Washington, D.C.

20555

.@m FE0111982> ~4 Attention: Document Control Desk u mas m casm '

  • ='*"**""I" 6

Isc g

Dear Sir:

33 N

Enclosed please find the Operating Status Report for the month of January, 1982, for Zion Generating Station.

Very truly yours,,

>g K. L. Graesser Superintendent Zion Station JhC/klm Enclosure (11) cc: F. A. Palmer J. G. Keppler (NRC)

K. L. Kohr L. D. Butterfield A. F. Veras f

f {,

Mrs. J. M. Cook Division of Env. Health State of Illinois 0018t 0094A 8202120176 820205 PDR ADOCK 05000295 R

PDR

>