Application for Amend to License DPR-3,proposing Tech Spec Change 176 to Modify Spec 3.3.3.2 Re Incore Detection Sys & to Add Spec 4.2.1.4 Describing Calculational Methods to Assure Adequate Operating Margins.W/Fee
ML20040G273
Person / Time
Site: Yankee Rowe
Issue date: 02/09/1982
From: Heider L
YANKEE ATOMIC ELECTRIC CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20040G274 List:
References
FYR-82-16, NUDOCS 8202120076
Download: ML20040G273 (3)


Text

-

YANKEE ATOMIC ELECTRIC COMPANY

' ' ' * ^ " * '" ' ' - * '

  • Q 1671 Worcester Road, Fra.ningham, Massachusetts 01701 2.C.15.1 YAuxcu ru,g?"8-6

~

s f:';f p m p

]e FEB 11 IS82S G, 4 C9?M.y< mrv.y; ;~

gj x :: ;[

~--

M2

~

Proposed Change No. 176

~

(, b Februa ry 9, 1982 United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Of fice of Nuclear Reactor Regulation Re f e re nce s :

(a) License No. DPR-3 (Docket No. 50-29)

(b) Amendment No. 53 to License No. DPR-3, dated November 24, 1978 Su bj ec t :

Technical Specifications Governing Operation of the Incore Instrumentation System (Proposed Change No. 176)

Dear Sir:

Pursuant to Section 50.59 of the Comnission's Rules and Regulations, Yankee Atomic Electric Company hereby proposes the following amendment to Appendix A of the Operating License.

Proposed Change Reference is made to the Yankee Plant Operating License No. DPR-3.

We propose to nodify the license as follows:

1.

"odify Specification 3.3.3.2 to allow for a change in the number of operable incore neutron detector thimbles for the remainder of

[

l Cycle 15 power operation.

/

2.

Add Specification 4.2.1.4 describing the calculational methods due l

to the above change used to assure adequate operating margins.

/

Reason for Change M/C This change would allow an increase in plant operating flexibility whilef Y000. N maintaining sufficient data collection capability to ensure that the operation of the core is within licensed limits.

8202120076 820209 PDR ADOCK 05000029 P

PDR

Of fice of Nuclear Reactor Regulation Proposed Change No. 176 Feb rua ry 9, 1982 Page 2 Description of Change The current technical specification governing operability of the incore instrumentation system requires that 12 neutron detector thimbles be operable with at least 2 per core quadrant whenever the system is used for core power distribution measurements [ Reference (b)].

The revised specification would allow for core power distribution measurements to be made with less than 12 operable thimbles if necessary for the remainder of Cycle 15 operation.

Yankee feels that this change can be made af ter 4000 MUD /MTU in a cycle.

At this point in the cycle operation, the core characteristics have been well established and specifically core power distribution is well defined. Burnup on Cycle 15 is currently at about 6000 MWD /MTU.

A discussion of Cycle 15 performance and an evaluation of specific core parameters is included as Attachment A of this letter.

Comparisons of measured values to limits have been made and margins to limits have all been acceptable.

These comparisons are illustrated as Figure 1 - 8 attached to this letter.

Based on these consistent performance records, a minimuu of 5 detector thimbles constitute an acceptable number of instrumented positions to monitor core perf ormance for the rest of Cycle 15.

Safety Considerations This change involves the gathering of data supporting reactor core operations. Operation within the proposed Technical Specification will not endanger the health and safety of the public.

This proposed change has been reviewed by the Nuclear Safety Audit and Review Committee.

Fee Determination This proposed change, as detailed above, requires an approval that involves a single safety issue and is deemed not to involve a significant hazards consideration.

For these reasons, Yankee Atomic Electric Company proposes this change as a Class III Amendment. A payment of $4,000 is enclosed.

Schedule of Change Yankee is hereby requesting a high priority review of this proposed change and approval by February 26, 1982.

The changes described herein will eliminate a current operating inflexibility in the Technical Specifications.

The Yankee Technical Specifications will be changed immediately following Commission approval.

Of fice of Nuclear Reactor Regulation Proposed Change No. 176 February 9,1982 Page 3 Ue t ru st that you will find this submittal satisfactory.

However, should you desire additional information, please contact us.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY N

d4 b L. H. Heide r Vice President COMMONWEALTil 0F MASSACHUSETTS)

)ss MIDDLESEX COUNTY

)

Then personally appeared before me, L. H. Heider, who, being duly sworn, did state that he is a Vice President of Yankee Atomic Electric Coa:pany, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Yankee Atomic Electric Company and that the statements therein are true to the best of his knowledge and belief.

(4 &

~

  1. ,,,7,0g '%,

Robert H. Groce Notary Public

,5

  • %,h,',

s, ' )

My Commission Expires September 14, 1984

-..A:

' ~

.~

^*,1,

"*M'

~

.s in ;

V

,. 4

', ' c ',. f s

e

_ _ _. _ _ _ _ _ _