Text
.-
POWER AUTHORITY OF THE STATE OF NEW YORK to COLUMBUS CIRCLE NEw YORK. N. Y.10o19 (212) 397 6200 GronGE7.ernny o[en' fiws 'ofr"ics'n inuaTEEs JOHN S DYSON, JOHN W. BOSTON Na'afor'w'rN='ocsounas
- P'"#0""""CE GEORGE L tNG ALLS veC E CM ainM AN JQggpH g, gqggggggg E 5 DE 4 cultF RICHARD M. FLYNN no.cari. mtLOuza February 5, 1982
!.io*,* *c'.^15,..
s FacDanicx n. cLAne JPN-8 2-16
'f,",'n""""*'
THOM AS R FREY Director of Nuclear Reactor Regulation
""g,v' 'cl"'f,'f,'"'
U.
S. Nuclear Regulatory Commission f
Washington, D.C.
20555 Attention:
Mr. Domenic B.
Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing D
N.
p\\
ir
Subject:
James A. FitzPatrick Nuclear Power Plant
-SVED ([
Docket No. 50-333
[
Environmental Qualification of Safety-2 ggdfgg,I ISSN Related Electrical Equipment Request r
for Additional Information
\\
t
Reference:
P.
J. Polk (NRC) to G.
T.
Berry (PASNY) 4 Q
-dated January 18, 1982; Same Subject
/
Dear Sir:
/
In response to the reference letter, copies of the documents you requested from our Environmental Qualification (EQ) central file have been sent to Mr. Cyril J. Crane of the Franklin Research Center.
This information is being supplied to the Franklin Research Center so that they, as your contractor, can complete their review of the Authority's response to the Safety Evaluation concerning the EQ of Safety Related Electrical Equipment.
You should be aware that items (mmm) and (ppp) listed in the enclosure to the reference letter, both refer to the same document.
Therefore, only one copy of this test summary has been sent to the Franklin Research Center.
This material is proprietary in nature and should be treated as such by Franklin Research Center.
Please instruct them to return the material after they have completed their review.
The information requested in Section B of the attachment to your letter has not been included with this package because the Fitz-
, Patrick Plant is currently in a refueling outage and is installing
.some of these TMI-related modifications.
The submittal of this in-formation will be delayed until May of 1982.
00& 0
. 9202110205
(
PDR ADOCK 0 3
P PDR
~
4 5
c
~
t If you have any questions, please do not hesitate to contact us.
Very truly yours,
(-
' -])
4 N.,
Bayne [
J P.
Senior Vice President Nuclear 1 Generation' cc w/ attachments:
Mr. Cyril J. Crane Franklin Research Center-The Parkway at Twentieth Street Philadelphia, PA 19103 w/o attachments:
Mr.
J.
Linville Resident Inspector U. S.-Nuclear Regulatory Commission P.
O. Box 136 Lycoming, New York 13093 Mr. Ron Barton United Engineers & Constructors, Inc.
4 30 S.
17th Street Philadelphia, PA 19101 k
e 8
W l
I l
e i
,,-,v,-
n-a p
.,w..-..-...
,-,my.-
,=n,,-
n ~-,,,-
-