Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO
MONTHYEARML20042A1561982-03-15015 March 1982 Telecopy of Ro:On 820315,standby Diesel Generator 1G-21 Would Not Start.Caused by Fuel Starvation Due to Fuel Oil Filter Casings Not Properly Filled.Sys Primed & Vented ML20041F1181982-03-0808 March 1982 Telecopy of Ro:On 820307,B Control Bldg Standby Filter Unit Train Failed to Start.Caused by Tests Being Performed on a Control Train Precluding Starting of B Train ML20041E6341982-03-0101 March 1982 Telecopy Message of Ro:On 820301,snubber GBB-3-SS-235 on B RHR Sys Removed from Svc for Testing.B RHR Sys & Containment Spray Sys Declared Inoperable.Due to a RHR Sys Also inoperable,24-h Limiting Condition for Operation Entered ML20041E4921982-03-0101 March 1982 Ro:On 820225,RHR Svc Water MOV 1947 at Outlet from B RHR Heat Exchanger Would Not Close.A RHR Sys Had Previously Been Declared Inoperable ML20040G0251982-02-0505 February 1982 Ro:On 820205,during Normal Operation Violation of Secondary Containment Occurred.Caused by Inner Airlock Door Personnel Door Inadvertently Being Opened While Railroad Airlock Door Was Open.Door Immediately Closed ML20040G0431982-02-0404 February 1982 Ro:On 820204,reactor Core Isolation Cooling MOV 2512 Found to Be Inoperable.Caused by Open Coil in Breaker.Coil Replaced ML20009B0451981-06-30030 June 1981 Ro:During 1981 Refueling & Maint Outage Turbine Was Found to Have Cracked Reversing Chamber & Broken Reversing Chamber Retaining Cap Screw.Cause Undetermined.Reversing Chamber & Bolt Replaced ML19312D8611980-04-25025 April 1980 Ro:During Normal Operation,Requirement Not Completely Satisfied to Establish Fire Watch Anytime Cable Spreading Room Carbon Dioxide Sys Is Inoperable.Watchman Did Not Have Key or Check Room Continuously.Room Opened in 30 Minutes ML19208D7611979-08-24024 August 1979 Submits Special Rept on Fire Protection Water Sys.On 790720, Electric Motor Driven Fire Pump 1P-48 Was Declared Inoperable Due to Water Leakage Around Pump Shaft Sleeve. Pump Overhauled & Returned to Svc 1982-03-08
[Table view] Category:LER)
MONTHYEARML20042A1561982-03-15015 March 1982 Telecopy of Ro:On 820315,standby Diesel Generator 1G-21 Would Not Start.Caused by Fuel Starvation Due to Fuel Oil Filter Casings Not Properly Filled.Sys Primed & Vented ML20041F1181982-03-0808 March 1982 Telecopy of Ro:On 820307,B Control Bldg Standby Filter Unit Train Failed to Start.Caused by Tests Being Performed on a Control Train Precluding Starting of B Train ML20041E6341982-03-0101 March 1982 Telecopy Message of Ro:On 820301,snubber GBB-3-SS-235 on B RHR Sys Removed from Svc for Testing.B RHR Sys & Containment Spray Sys Declared Inoperable.Due to a RHR Sys Also inoperable,24-h Limiting Condition for Operation Entered ML20041E4921982-03-0101 March 1982 Ro:On 820225,RHR Svc Water MOV 1947 at Outlet from B RHR Heat Exchanger Would Not Close.A RHR Sys Had Previously Been Declared Inoperable ML20040G0251982-02-0505 February 1982 Ro:On 820205,during Normal Operation Violation of Secondary Containment Occurred.Caused by Inner Airlock Door Personnel Door Inadvertently Being Opened While Railroad Airlock Door Was Open.Door Immediately Closed ML20040G0431982-02-0404 February 1982 Ro:On 820204,reactor Core Isolation Cooling MOV 2512 Found to Be Inoperable.Caused by Open Coil in Breaker.Coil Replaced ML20009B0451981-06-30030 June 1981 Ro:During 1981 Refueling & Maint Outage Turbine Was Found to Have Cracked Reversing Chamber & Broken Reversing Chamber Retaining Cap Screw.Cause Undetermined.Reversing Chamber & Bolt Replaced ML19312D8611980-04-25025 April 1980 Ro:During Normal Operation,Requirement Not Completely Satisfied to Establish Fire Watch Anytime Cable Spreading Room Carbon Dioxide Sys Is Inoperable.Watchman Did Not Have Key or Check Room Continuously.Room Opened in 30 Minutes ML19208D7611979-08-24024 August 1979 Submits Special Rept on Fire Protection Water Sys.On 790720, Electric Motor Driven Fire Pump 1P-48 Was Declared Inoperable Due to Water Leakage Around Pump Shaft Sleeve. Pump Overhauled & Returned to Svc 1982-03-08
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8991999-10-18018 October 1999 SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With ML20212H2381999-09-22022 September 1999 Safety Evaluation Supporting Amend 228 to License DPR-49 NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With ML20195G9901999-06-0909 June 1999 Safety Evaluation Supporting Amend 227 to License DPR-49 NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With ML20206N7551999-05-13013 May 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safey-Related Power-Operated Gate Valves NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With ML20207G0251999-03-0303 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05 NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With ML20202B4311999-01-26026 January 1999 Safety Evaluation Accepting Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr ML20202B3851999-01-26026 January 1999 Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues.Ampacity Derating Analysis Results Acceptable NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With ML20206N3211998-12-0707 December 1998 Final Part 21 Rept Re Piston Failure of MSIV Actuator at Daec.Rept Indicates That No Reportable Defect Exists,Per 10CFR21 NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With ML20196F9571998-11-24024 November 1998 Rev 20 to QA Program Description,Ufsar 17.2 for Daec NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With NG-98-1767, Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with1998-09-30030 September 1998 Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236X5321998-07-29029 July 1998 Safety Evaluation Re USI A-46 Program Implementation for Plant ML20236W0021998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief NDE-R020 Re Third 10-yr ISI Interval of Plant,Per 10CFR50.55a(a)(3(i) ML20236S2541998-07-14014 July 1998 Special Rept 98-01:on 980629,diesel-driven Fire Pump Was Inoperable for Greater than Seven Days.Caused by Sheared Off Tie Rods on Accessory Drive End of Engine.Evaluated Condition,Procured Parts & Replaced Tie Rods ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247P5651998-05-18018 May 1998 Part 21 Rept Re Model SA-A101 MSIV A' Actuator Showing Evidence of Internal Leakage,In Both Directions Past Pneumatic Piston.Situation Being Reviewed to Determine If Failure Could Pose Substantial Safety Hazard ML20247K1881998-05-0808 May 1998 Rev 0 to Cycle 16 COLR, for May 1998 ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216J9171998-04-16016 April 1998 Safety Evaluation Accepting Relief Request MC-R001 for First 10-yr Interval of Containment Insp Program Per 10CFR50.55a (a)(3)(ii),per 971219 Request ML20217K7251998-04-16016 April 1998 Correction to SE of Relief Request MC-R001 Re Qualification Requirements for non-destructive Exam Personnel Performing Containment Insp ML20217K0471998-04-0101 April 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request NDE-R004 for Plant Third 10-yr ISI Interval,Based on Finding That Compliance W/Code Would Result in Hardship W/O Compensating Increase in Level of Quality & Safety ML20217H8831998-04-0101 April 1998 Safety Evaluation Supporting Request for Relief for Third ISI Program NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC ML20217F8841998-03-23023 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Program Plan Requests for Relief for Plant NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center ML20199L3481998-01-31031 January 1998 Rev 0 to Duane Arnold Energy Ctr Emergency Action Level (EAL) Technical Basis Document ML20249B3331997-12-31031 December 1997 1997 Annual Rept for Alliant Corporation ML20249B3391997-12-31031 December 1997 Central Iowa Power Coopertive 1997 Annual Rept ML20249B3351997-12-31031 December 1997 1997 Annual Rept for Corn Belt Power Cooperative NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC ML20199J6841997-11-21021 November 1997 SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy Center NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC 1999-09-30
[Table view] |
Text
{{#Wiki_filter:,
, .n
' ~ '
Inwe Eintric Light and Amer Cc;ny * .
Fhheary 5 198r -
l DetC-82 84 .
g Dir, James-8, Neppler, Direetor. -
Office of Inspectton and Enforcement - Itagios III >$ M, i a,k
. U. S. Nuclear Regulatory Commission -
4/
O Cavr~.'#. hM 799 gBosevelt Road' -
c-Glen..E 1 1y%.1L 60137 .
~ " I V 193;>c d~j_'$Yl?Qv..m{
Q 7"
Subject:
Proset Jtotification of a .
Ej'i ?
Itaportehle Oqcurrence -
s ./ 7.
4 s'g Filet. A-U8s .
Dear Mr. Kappler - .
This letter,'teleco~ pied to your office, is 1Ateeded'to settiff th requirement for notification of a Reportable Occurrence in .
eccordance with ification 6.11.2.a of the Duane Arnold Enevity Center Technical.5pecif$cetions.. .
Technical . Spect fication.paraM s) . viol ated:. $.1,c. ,
. Description Occurrences ,
During normal operation on 2/5/82. a viq1stion of secondary contaitument occurred. leitle the outer reactor building railroad airlock door was open to allott new fuel to be noved fato the reacter building,. the inner airlock door personnel door was inadvertently
- opened which.vdoleted secondary contairement. The door was immediately closegt which ,tustored secondary contairusent 16tegrity. W security WattNunn hts beetp stationed at-tte-door to prevent recurrence while repairs are being made to the interlock ennie .
Very.truly_yggrs .
in.)-{$ttsd Daniel .L..Mineck-Chief Esigineer Duane Arnold [nergy Center .
DLM/JV5/p1 -
cc: IRC Resident inspector .
8202110113 820205 -
PDR ADOCK 05000331 -
S PDR sm , A ca.NTt. tty or samvien . su - i"
#asemeert.M heng Croseer
- MA, Higt 22t
- Creass naysiset leases Aseesti
- 3 sAHf Auff f My}}