ML20040F942

From kanterella
Jump to navigation Jump to search
Advises of Necessity to Revise Environ Review Schedule Due to Applicant Failure to Provide Response to NRC 811026 & 1215 Requests for Info.Schedule for Responding Should Be Provided by 820129
ML20040F942
Person / Time
Site: Clinch River
Issue date: 01/26/1982
From: Check P
Office of Nuclear Reactor Regulation
To: Longenecker J
ENERGY, DEPT. OF
References
NUDOCS 8202100495
Download: ML20040F942 (2)


Text

-

'e. g

(,

I DISTRIBUTION:

Docket File e L cal NR JAN 2 S 199',

NRC PDR N

g CRBP Reading Fi Docket No. 50-537 NSIC c5 DEcgf'/EO PLeech S

CThomas fir. Jchn R. Longenecker, Manager s

Licensina and Environmental Coordination g

2773.h PShuttlewort CFoster

(

irgg%% //j i

M

. Clinch River Breeder Reactor Plant PCheck 4

U. S. Department of Energy, NE-561 Washington, D. C. 20545 i

Dear Mr. LonrJ9nedker:

l E

SUBJECT:

FZQUESTS FOR ADEITIONAL INFORMATION FOR CRBR PLANT I

ENVIRONMENTA!/ REVIEW

^

By letter dated 0ctober 26, 1981, we requested additional infonnat6on concern-E ing feel cycle, waste management and safeguards aspects of the Clinch River BreederReactor(CRBR) Plant (Request 750.1R). By letter dated November 30,

=

T 1981, we requested additional information concerning e.lternative sites for the CRBR Plant (Requests 750.2R, 750.3R and 750.4R). As indicated in our letters, this information was needed by December 15, 1981 in order for us to maintain our environnental review schedule.

On several occasions, we have discussed our information needs concerning these matters with you ar.d your representatives. On those occasions, we have stated that our evaluation of these matters is vital to the completion of our a"

environmental review. ~

g We have not yet received the needed information. Thus, it has become necessary 3

to revise our environmental review schedule.

Please advise us, therefore, of F

your schedule for responding to these infonnation requests.

In order that we r

will be able to discuss'our environmental review schedule at the forthcoming ACRS subcormlittee meeting and ASLD.prehearing conference, please reply to this e

5 letter by January 29, 1982.

f, Sincerely, Original Sigel by

?

Paul S. Check

[

Paul S. Check, Director CRB1 Program Office r

Office of Nuclear Reactor Regulation E

~

cc: Service List,

a, w

G202100495 820126 PDR ADOCK 05000537 A

ppd O

'N RP0:NRR d

CRBMd:NRR CR KO[RR YE55di/fic oi5as

~

ter

'....ck

,sumue >

1/4....._..

1/. 2. 5../. 82 1/.,,",/ 82 1

82

/82 c

omy OFFICIAL RECORD COPY es= =-mm i

rmc ronu :ns pea rmcu cm 1

n.w

  1. 9 M

cc:

Dr. Cadet H. Hand, Jr., Director Barbara A. Finamore Bodega Marine Laboratory S. Jacob Scherr University of California Ellyn R. Weiss P. O. Box 247' Dr. Thomas B. Cochran Bodega Bay, California 9.4923 Natural Resources Defense Council, Inc.

1725 I Street, N.W.

Daniel Swanson Suite 600 Office of the Executive Washington, D.C.

20006 Legal Director U. S. Nuclear Regulatory Commission Washington, D.C.

20555 William B. Hubbard, Esq.

Assistant Attorney General State of Tennessee Office of the Attorney General 422 Supreme Court Building i

Nashville, TN 37219 Luther M. Reed, Esq.

Attorney for the City of Oak Ridge 253 Main Street, East Oak Ridge, TN 37830 l

~

'ri George L. Edgar, Esq.

i Morgan, Lewis & Bockius 1800 M Street, N.W.

Washington, D.C.

20036 Herbert S. Sanger, Jr., Esq.

l General Counsel Tennessee Valley Authority Knoxville, TN 37902 Chase Stephens, Chief l

Docketing and Service Section Office of the Secretary I

U. S. Nuclear Regulatory Commissica l

Washington, D.C.

20555 l

l Raymond L. Copeland l

Project Management Corp.

l P. O. Box U Oak Ridge, Tennessee 37830 L. Ribb LNR Associates Nuclear Power Safety Consultants l

8605 Grimsby Court Potomac, MD 20854