ML20040F553

From kanterella
Jump to navigation Jump to search
Requests Exemption Per 10CFR50.12 from Requirements of 10CFR50.48 to Allow Extension to 820601 for Submitting Fire Protection Upgrade Response Design Descriptions for Unit 2. Unit 1 Commitment Remains Unchanged
ML20040F553
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/28/1982
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8202090336
Download: ML20040F553 (2)


Text

. _ _ _ _ _ _ - _ _

Malling Address Alibama Power Company 600 North 18th Street o

Post Office Box 2641 4

Birmingham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

S "QCZ"l"'

Alabama Power

,i t?c southem oatnc system January 28, 1982 y s 3 ] n.m, g

9%*

'O v'

V f Docket No. 50-348 N

s Docket No. 50-364 rM

.'.' * : us h d

PQ] n Director, Nuclear Reactor Regulation

[

gr OO2A gtjp U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 Q

7 Attention:

Mr.

S.

A. Varga Farley Nuclear Plant Units 1 and 2 Fire Protection Upgrade Response to 10 CFR 50.48 and 10 CFR 50 Appendix R Requirements Gentle;ne n:

Alabama Power Company has requested in letters of March 19, 1981 and June 23, 1981 that the date in 10 CFR Part 50.48, Paragraph (c)(5) for submitting design descriptions of dedicated shutdown systems, or other similar modifications, be extended to October 1, 1982 for Unit 1 and March 1, 1982 for Unit 2.

These commitment dates, as stated by our March 19, 1981 letter, were predicated upon best estimate of schedules for refueling outages.

Since the establishment of these commitment dates, unforeseen, forced outages have occurred on Units 1 & 2.These outages have resulted in a redirection of available manpower including design support.

This reallocation of resources has not allowed the completion of initially scheduled activities associated with the subject design effort.

Consequently, an exemption is requested, pursuant to 10 CFR Part 50.12, from the requirements of 10 CFR Part 50.48 to allow the extension of the date in the aforementioned letters for submitting design descriptions of alternate or dedicated shutdown systems needed to satisfy Section III.G.3 of 10 CFR Part 50 Appendix R from March 1, 1982 to June 1, 1982 for Unit 2 of the Joseph M.

Farley Nuclear Plant.

With respect to Unit 1, every effort is being made to submit the design descriptions of the dedicated shutdown y

systems, or other similiar modifications, by October 1,

1982, as originally committed.

/ 6 8202090336 820128 PDR ADOCK 05000348 F

PDR

.s. *,

4 Director, Nuclear Reactor Regulation

- J anu a ry - 28, 1982

- U. S. Nuclear Regulatory Commission Page 2 If you have any questions, please advise.

Very truly s,

L F.

L. Clayton, Jr.

FLCJr/ MAL jc cc:

Mr.

R. A.. Thomas Mr. G.

F. Trowbridge Mr. J.

P. O'Reilly Mr.

E. A.

Reeves Mr. W. H.

Bradford m

4 1

d l

e w.

v v

v'-**r-

- - - +,, *

-o-

-w+

~ + - -* =

-v-4*wi-

---+-w-,-ee-t

  • ----+v-e e

=e

- w er7-

  • w---v---

P--