Approves 811218 Proposed Revision to QA for American Inst of Steel Const,Inc Nuclear Quality Certification Program. Listed Changes Should Be Incorporated Into Revision
ML20040F425
Person / Time
Issue date: 01/26/1982
From: Haass W
Office of Nuclear Reactor Regulation
To: Peshek C
AMERICAN INSTITUTE OF STEEL CONSTRUCTION, INC.
Shared Package
ML20040F418 List:
References
NUDOCS 8202090181
Download: ML20040F425 (1)


Text

_ _ _ _ _ _ _ _ _ _ _

t.S Kf Cgo

  • ![%

UNITED STATES 7.

NUCLEAR REGULATORY COMMISSION f; h

,. j l

WASHINGT ON,0. C. 20555 e,

1 gQ %,.... /e JR 2 61982 Mr. Charles Peshek, Jr.

Director of Quality Certification American Institute of Steel Construction, Inc.

400 North Michigan Avenue Chicago, IL 60611

Dear Mr. Peshek:

SUBJECT:

NRC ACCEPTANCE OF REV.10F AISC T'0PICAL REPORT (FCTPN-78)

In your letter. dated December 18, 1981, you submitted a proposed revision to the AISC topical report, " Quality Assurance for AISC Nuclear Quality Certifica-tion Program."

The principal purpose of the revision is to clarify the design responsibilities of the owner (or his engineer) and of the fabricator. This was done by revising the introduction and adding requirements under Item No.

3.0, " Design," to the Nuclear Certification Program Evaluation / Audit Checklist.

Other changes address the delegation of your authority, correction of a print-ing error, and clarification that your operation is audited by two members of the AISC Task Committee on Quality Certification and not by the AISC Board Commi ttee.

p Based on our evaluation of the changes proposed in your December 18,1981, let-d ter, we find that the proposed revision is acceptable with the following condi-tions which we discussed during previous telephone conversations.

1.

Add the following sentence at the end of the revised last paragraph of Section I: "This approval also indicates completion of an independent verification of the adequacy of the shop detail drawings in accordance with Criterion III of Appendix B to 10 CFR Part 50."

2.

Add the following words to the last sentence of Section III.D.1:

, and the nuclear quality assurance program requirements supplement (i.e., do not replace) the Category I or Category II quality assurance program requi remen ts. "

3.

Add "Section X, Reference" to the topical report and include therein the AISC Code of Standard Practice for Steel Buildings and Bridges.

Please incorporate the revision, the reference, and this letter into the topical report and fomard 20 copies to the NRC.

Should you have any questions regard-ing our review or if we can provide assistance, please contact Mr. Jack Spraul on (301) 492-9495.

Sincerely,

/7 O

gesks,es@rea.3,,,et t et lt;f[~~~

Walter P. Haass, Chief Quality Assurance Branch Division of Engineering 8202090181 820203 PDR TOPRP EPSAISC C