Responds to NRC 811214 & 1113 Ltrs Re Violations Noted in IE Emergency Preparedness Appraisal Repts,Corrective Actions: Table Containing Revised Protective Action Recommendations Incorporated Into Emergency Plan Implementing Procedure
ML20040F372
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 02/01/1982
From: Rausch T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8202090126
Download: ML20040F372 (2)


Text

'

,CN Commonwealth Edison PRINCTPAL STAFF

) Ona First National Plaza. Chicago. Ithnois MJIR I/eJ6IS k,[

O t

C

~7 Address Riply to: Post Office Box 767

(

/ Chicago, Illinois 60690 7/D

- ?AO

'dU M

February 1, 1982 nnAm DE&TI Mr. James G. Keppler, Regional Administrator gq

! dkP&Of

"!b Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Q

Subject:

Dresden Station Units 1, 2 and 3

/;/

9 Response to Confirmation of

. a,W Action Letter Concerning the iy

,g

  1. f O Jg b

Emergency Preparedness Appraisal f1

-cdigg,g NRC Docket Nos. 50-10/237/249 n

icg mtq~4

-)Vg~ I 4

//

References (a):

J.

G. Keppler letter to Cordell K

Reed dated Novembe r 13, 1981, (Confirmation of Action Letter)

(b):

J. G. Keppler letter to Cordell Reed dated December 14, 1981, (Emergency Preparedness Appraisal)

(c):

T.

J. Rausch letter to J. G. Keppler dated January 12, 1982.

Dear Mr. Keppler:

References (a) and (b) described five immediate corrective action items associated with the special appraisal of the emergency preparedness program at Dresden Nuclear Power Station.

Commonwealth Edison nas completed the required actions within the agreed upon time frame; a detailed discussion of the actions taken is provided in the attachment to this letter.

Please address any questions you may have concerning this matter to this office.

Very truly yours, j b w Y m.C g.

Thomas J. Rausch Nuclear Licensing Administrator Boiling Water Reactars lm cc:

Region III Inspector - Dresden Attachment 3363N 8202090126 B20201 DR ADOCK 05000

ATTACHMENT Dresden Station Units 2 and 3 Completion of Appendix A Confirmation of Action Letter Items in the Dresden Emergency Prepared Appraisal Audit 1.

The table containing the revised Protective Action Recommendations (Table 6.3-1) has been incorporated into the appropriate Dresden Station Emergency Plant Implementing Procedure (EPIP 300-1).

That revised procedure was distributed on January 26, 1982.

Training of the Station Directors who will be responsible for making Protective Action Recommendations was completed on January 21, 1982.

The on-site review recommending approval and authorization of the use of the change in the Generating Stations Emergency Plan was completed.

The change to the GSEP has been prepared and reviewed, and will be distributed shortly.

2.

The Notification Phone List in the Dresden EPIPs was revised on November-18, 1981, to provide additional assurance that augmentation capabilities at the station are appropriate.

3.

A memo has been issued to Recovery Managers and Nuclear Duty Officers to describe the latest revisions to the Corporate Command Center Director's Call List.

The memo explains that-the new call list has been prepared to ensure that the near site Emergency Operating Facility (EOF) can be manned within 60 minutes o f determining that the facility must be activated.

4.

The change to EPIP 500-7 describing the new procedures.

for conducting communciations checks with the NRC was distributed on January 20,'1982.

The new procedure ensures these communications checks are conducted as required by 10 CFR 50, Appendix E.

5.

Two letters from L. O. DelGeorge dated January 15, 1982, have been sent to Mr. J. G. Keppler describing the early notification system for Dresden and the latest implemen-tation schedule.

We believe these two letters satisfy the actions required for Item 5.