ML20040F333

From kanterella
Jump to navigation Jump to search
Forwards Ultimate Structural Capacity of Mark III Containments, Interim Rept.Final Rept Will Be Submitted in Mar 1982 as Part of Hydrogen Control Program
ML20040F333
Person / Time
Site: Perry  
Issue date: 01/25/1982
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML20040F334 List:
References
NUDOCS 8202090090
Download: ML20040F333 (1)


Text

- - - - - - - - -

T'H E C L EV E L A N D E L E CT RIC IL L U MIN ATl H G C O M P A N Y P o. Box 5000 m CLEVELAND. ohio 44101 TELEPHONE (216) 622-9800 m ILLUMINATING BLDG.

m 55 PUBLIC SOUARE m

Datwyn R. Davidson vlCE PRESIDENT SYSTEM ENGINEERING AND CONSTRUCTION

^

?t

??

r..3 3,'n January 25, 1982 o.-

J\\

"i3 31993 f Mr. Robert L. Tedesco Assistant Director of Licensing ej r;mm mma C/

')[ trua u tr,o a f

Division of Licensing X *, /

U. S. Nuclear Regulatory Commission Washington, D. C.

20555

~a Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Ultimate Capacity Analysis of Mark III Containment

Dear Mr. Tedesco:

Please refer to the subject letter dated December 26, 1980 and my response to you dated January 22, 1981. Enclosed is our l

interim report entitled, " Ultimate Structural Capacity of Mark l

III Containments". A draft of this report was presented to the l

Structural Engineering Branch reviewers during the PNPP structural audit during the week of December 4,1981. We expect the final report to be submitted in March 1982 as part of our Hydrogen Control Program submittal.

Very Truly Yours, Dalw 1 R. Davidson Vice President Structural Engineering and Construction DRD: mlb cc:

Jay Silberg, Esq.

M. Dean Houston Max Gildner 6

8202090090 820125 PDR ADOCK 05000441 A

PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _