ML20040F172
| ML20040F172 | |
| Person / Time | |
|---|---|
| Site: | 07001201 |
| Issue date: | 01/29/1982 |
| From: | David Jones, Mcalpine E, Richards B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20040F167 | List: |
| References | |
| 70-1201-82-01, 70-1201-82-1, NUDOCS 8202080409 | |
| Download: ML20040F172 (1) | |
Text
,
MATER!AL TRANSMITTED HIRPhilH coNTAms 2J90 WOiWAllGN pug o
UNITED STATES.
3
~.%
' NUCLEAR REGULATORY COMMISSION E
REGION 11 o,%
f[
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303
- o' g
{ M2 Report No. 70-1201/82-01 Docket No. 70-1201 License No. SNM-1168 Safeguards Group No. III Licensee: Babcock and Wilcox Company f
Commercial Nuclear Fuel Plant P. O. Box 800 Lynchburg, VA 24505 Date of Inspection: January 11-15, 1982 Type of Inspection:
Unannounced Material Control and Accountability Inspectors:
RfTO RQ di e i h (1/ 91 D. W. Jones, Statist.ician F' Date Signed NfTO' CD 9 ct l/'29/6L
, e B. L. Richards, Stathisticia'rl' Date Signed Approved by:
MTT(\\' (1 Q c tw_,
t /'29 /8 2-E. J. McAlpine, Chi' f, Material Control and Date Signed e
Accountability Section Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected: Statistical controls, facility organization, and management of materials control system.
The inspection involved 50 inspector-hours by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the three areas examined during the inspection.
S-F2 M-lI Copy 3-of f Copics
,2 Pages Thin Decurent 1:5nottobe reprcduced *rithout ::pecific approval of IE II MATERIAL TRAN$ MITT!D HTREVATH CCNTAINS 2J90 INFORNAlloN 8202080409 820201 PDR ADOCK 07001201 C
]