ML20040F070
| ML20040F070 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/29/1982 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07.28, NUDOCS 8202080283 | |
| Download: ML20040F070 (1) | |
Text
I OUISIANA f 342 OctAnONOt sincer POWE R & L1GH T/ P O BOX 6008
- NEW ORLEANS LOUIStANA 70174 * (504) 366 2345
00$ s?S40) u January 29, 1982 G. D. McLENDON Senior Vice President W3K-82-0049 Q-3-A35.07.28 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 p
'/
Docket No. 50-382 e
Significant Construction Deficiency No. 28 RECI'~
Y "Two-Inch and Below Schedule 160 Socket Welds Undersl @'
FEB 5 1982 > ;1..
Fifth Interim Report n 2_: t.
't
~
Reference:
LP&L Letter W3K81-0382 to USNRC dated October 19, 1 1.2 j,,,
.Q
Dear Mr. Collins:
'b /j]-
g The referenced letter indicated that a report would be submitted on Significant Construction Deficiency No. 28 by January 29, 1982.
Presently, Tompkins-Beckwith, Inc. (T-B) has completed their reinspection of all two-inch and under schedule 160 socket velds. Based upon this inspection, 579 welds required repair.
T-B anticipates the completion of this repair to be February 1, 1982.
In order to complete the corrective action on this Significant Construction Deficiency, additional time is required. Therefore, a final report will be submitted by March 1, 1982.
If you have any questions, please advise.
Very truly yours, GDMcL/LLB/grf 7.__
a
% hj (b), k =liY / U ' t
\\
i i
J cc: 1) Director Office of Inspection & Enforcement jf I
f U. S. Nuclear Regulatory Commission f@
l l982
{
Washington, D. C. 20555
}
- 2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8202080283 820129 PDR ADOCK 05000382
/g S
PDR l