ML20040E350

From kanterella
Jump to navigation Jump to search
Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 1903.10 Re Emergency Action Level response,1903.22 Re Fire or Explosion & 1903.70 Re Russelville Fire Dept
ML20040E350
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/15/1982
From: Ohandan J
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20040E348 List:
References
PROC-820115-01, NUDOCS 8202040217
Download: ML20040E350 (3)


Text

e 3, s A ap]

way.nM P mm1 S /d3

/[NbK NSNS NONEY1 h E15NT COMP x

Arkansas Nuclear One y

PROCEDURE CHANGE REQUEST roRu 1000.0eC sEMELGm0&t Aenod&&& 85@Ed'M"A "3

)

lPfjoC/ WORK PLAN NO.

Rb.

10 CFR 50.59 APPLICABILITY: (Unreviewed Safety Question)

YES NO

..[

hvolves a change to a procedure described in the FSAR....................D

't **

Involves a change to a test or experiment not described in the FSAR..........D EXPIRATION DATE: (IF TEMPORARY)

Involves a change that aNects compliance with the Technical Specif.~catione.... 0 %

If the response to any of the above is YES. complete and attaen FORM 1000.06E.

AFFECTED UNIT:

lnvolves a change in the PURPOSE of the procedure....................... D

%[

ANO-1 f ANO-2 [

Involves a change in the SCOPE of the procedure......................... O Degrades the controle preecribehAdmin. Procedures..................O k Involves a change that reduchtN eYtNl safety........................ 0 SAFETY RELATED:

Involves a change that egrades thhecep'tarice, criterta....................D p

PSC and approved bMhe GM mon,s's YES. th'e[ change mus YESM NO O If the response to any,of the abpv i

Mplementajlon.

REASON FOR CHANGE:

N

~l P//0/06 $ 6/nst1Gf h'i'lu $/

% s#

]

PARA / STEPS AFFECTED DESCRIPTION OF CHANf"dS:

k&(fj{rhi 0,()

$/bb t

)

z f 3) se-28-

'I ll

'l ll s

PREPARED BY:

ATE:

IF INTENT CHANGE:

(ENG. GROUP)

DATE L

UNREVIEW' YES L]. NO SAFETY QU STION (OC GROUP)

DATE FINAL REV1 / APPROVAL:

(INDEPENDENT REVIEW)

DATE r'(SUPERV@R) /#

DATE INTERIM OV I

4 (Q Pf"O AM COMPLIANCE)

[ ATE

(

' RVISOR)

'DATE D

Y,/

I/lh D UA m A./ AIWL lA N l'&$k MPSC)'

V

' DATE (SRO NIT ONE)

DATE if/ $V

/ lh/ / 4 / t l Y

.0

.lut seant (GMi/ ' _. _

t (SRO (JNIT TWO)

DATE BEOitRXMW3$$I' 8202040217 820201 CE-

-GF-PDR ADOCK 05000313 l

F PDR

i 4

ees]1 fI

\\

. r, 5, n...m',,,,J.bt.}

lh n'JJ C

/Tf6

... e <

un

.d i i m ', i v tw i gr,-"7 7

ARKANSAS' POWER & LIGHT COMPANY g

FA a Arkansas Nuclear One

(.

w =s

  • y PROCEDURE CHANGE REQUEST rORu toco. cec

[j g[

[ %/O E:

T PC ARY

,I a

, i,,, PPOC/ WORK PLAN NO.

REV.'

to CFR 50.59 APPUCABILITY: (Unreviewed Safety Ountion)

YES NO

], ((

[

Involves a change to a procedure described in the FSAR....................Q j.,'

Involves a change to a teet or experimert not desenbod in the FSAR..........D EXP! RATION DATE- (IF TEMPORARY)

Involves a change that affects compliance with the Technical Specificatione.....D g

?

If the response to any of the above le YES. ccmplete and attach FORM 1000.06E. /

AFFECTED UNIT:

DETERMINATION OF INTENT:

YES NO Involvw a change in the PURPOSE of the procedure.......................O [

ANO.1 ANO-2 M Involvw a change in the SCOPE of the procedure.........................O Degrades the controle proecribed in the Admin. Procedures..................D involva. chang. that r.ducos th. tem 3.#r tory......................... o ea SAFETY RELATED:

Involves a change that degrades _the a'c'ce tale'e'keja....................D YES NO O If the response to any of the above le '. the change must be reviewed by the PSC and approved by the GM prior ytyptatiokh f*

h REASON FOR CHANGE:

If

=

kOk [ d///f/

3 'I "",

h

\\%

A

' PARA./ STEPS AFFECTED DESCRIPTION OF CHANGES:

@, Y, [

8 /// 9f] W Y $$ $ -36~25^ "

To

"$9-6/ / $ "

s PREPARED BY:

A.

IF INTENT CHANGE:

/ 7 8&-

Al p/

(ENG. GROUP)

DATE UNRO/JEWE YEs O NO SAFETY QUESTION (OC GaOuP)

DATE -

FIN ROVAL:

l

/j (INDEPENDENT REVIEW)

DATE I

I i3 /

^

wn

' (SUPERVISOR)

/

DATE INTERIM A r

i d

/7JD i

( A OGR COMPUANCE)

D TE GOG SUPE S6R)#

/ M ATE u-

)

2

/2---

b f$1' boda

/ ~ '7 -f2

(

~/

DATE (PSC)'

/(SRO,.}) NIT ONE)r%aw it-7/Pz DATE J/M/A a1&

ific/w (GK

/V DATE '

' (SRO UNIT TWO)

DATE

s

. m a

u a

a _. _.

m

,,s n

.....v 3p i i s,

j e.; i t

tir

/ UV dh ARKANSASJOWER.4,.;2 LIGHT COMPANY-

)

~

yc 7d I

?

Arkansas Nuclear One nw v PROCEDURE CHANGE REQUEST FORM 1000.0eC l ()f5&j,y&( fff

,jggj((7

_f_

E:

7,.

OC/ WORK PLAN NO.

R EV.-

10 CFR 50.59 APPUCABILITY: (Unreviewed Sofoty Question)

YES Q

j

]

Involves a char *ge to a procedure described in the FSAR....................D Involves a change to a test or experiment not described in the FSAR..........D EXP! RATION DATE: (IF TEMPORARY)

Involves a change that affects compliance with the Technical Specificatione.....D If the response to any of the abo <a is YES. complete and attach FORM 1000.06E. -

AFFECTED UNIT:

N Involves -a change in the PURPOSE of the procedure.......................D fl.

ANO.2[

Involves e change in the SCOPE of tne procedure.........................D [

ANO.1 Degrades the controle presenbod in the Admin, Procedures..................D p

[k involves a change that reduces the lesel fef e'afetyh......................D l

SAFETY RELATED:

Involves a change that degrades,the'acceptange crite$a

...................D YES NO O if the' response to any of the above le YES. The change must be rev%ed by the PSC and approved by the GM-prior to ie[dMytton. k h

h REASON FOR CHANGE:

W.)

PARA./ STEPS AFFECTED DESCRIPTION OF CHANGES:

~

s, /

6///hdW 68-3525'

  • ro 96 8 - 8 // 0 PREPARED BY:

AT IF INTENT CHANGE:

[$ M M4d e

(ENG. GROUP)

DATE UNRED/JEWEDP YES O No SAFETY QUESTION (OC GROUP)

DATt FINAL REVIEW /

OVAL./

/

(INDEPENDENT REVIEW)

DATE

/ /3//L 4

(SUPERVISOR)lj

' DATE INTERIM OV

/#dL '

A

//1/ W m

\\

(OA PRO RAWCOMPUANCE)

ATE SUPEydSOT

( DATE S

( Ws/

H fL meb V/lWI UY l~')-f.L o

/

(j

' DATE SRO UNIT ONE)

DATE (PSC) 1 J$ Oh. L. t,,je<L4.a i/g}ez.-

/7%/onw

//7/P2'.

(Gh4)

/y OATf (SRO UNIT TWO)

DATE

- -