ML20040E341
| ML20040E341 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 01/19/1982 |
| From: | Pliml G COMMONWEALTH EDISON CO. |
| To: | Harold Denton NRC |
| Shared Package | |
| ML20040E340 | List: |
| References | |
| A-82-14, NUDOCS 8202040210 | |
| Download: ML20040E341 (3) | |
Text
.
.. - _. - ~.
d G#
A-82-14 EPIP 320-1 1-19-82 NOTIFICATICN OF FRO GOURE CHANGE 4 b"- Y 2 q, h().e #% )
Sock #(s)
.< n
<- O W.
Mr/Ms ACP Abncrmal Operating Prccedures
+
ECP Emergency Operating Procedures x
EPIP - Emergercy Plan Imolementing Procedures Fuel Handling Instructions FHI GOP - General Operating Procedures MI Maintenance Instructicns PT Periccic Test Procedures ~
RP Radiation Protection Procedures c) g SOI System Operating Instructions TSS Tecnnical Staff Surveillances f?
\\
ZAP Zicn Acministrative Procecures jQ/
g g.jg g(\\
ZCP Zicn Chemistry Precedures fg ZED Zicn Electrical Distribution y
- ; ~7 ANNUNCIAIGR RESPONSE MANUAL
!2-TU7Typ CURVE SOCK g
FSAR - Final Safety Analysis Report ta ZION TECH SPECS - Technical Specifications
/
4 Filina Instructions:
- Please revise per attached changes to EPIP 320-1, pgs. 1& 5.
Rev. 4 Jan. 18, 1982 Please ackncwledge receipt of the above listed precedure(s), instructicn(s) or revision (s) by returning this receipt letter to M. A. LePage, Zica Station.
Signed Cate
.I..,. s...
p, j... : y d.e
., ~.. -
.1
,i.
,.e-
?.
.s.
.L
...~ : u.
c.
. y G. P11m1 8
Asst Sucerintendent Zion Station FCR OFFICE USE ONLY Recelot Audit:
. Date Of Audit
- ReceiDts Not Received Recelots Recuested' All prececure(s), instruction (s) or revision (s) listed were distributed
[#g on Jan. 19, 1982 in accordance with the Zicn Distribution List.
-.,x m,,,, w 3.
gg f
^ E P C.~<Ov0 U
8202040210 020201 PDR ADOCK 05000295 F
,, r 5)
ZAP 5 514 g
STATION PROCEDURE CHANGE REQUEST Q'
Rn O 9
i Procedure intent changes require Station Revievv before using.
CHANGE Procedure changes with prior Station Review do not need SRO approval.
REQUEST
~
PROCEDURE TITLE AoIMId 44 744 Cit / JT47U 6eiv NUMBER EsW J?0-I Permanent Change
[
Expiration Date New Procedure O
Special P.ocedure O
Desired Ef factive Date l~ $ ~
Yes O No O Brief Description C/
-aA iA ed 6
d es.1 cr i
RL k
l l.
Reason for change NA n-o A
--l e8 l t
Requested By
d Date /-/2 9 2-Department T*/ d/d %
Temporary Change Approval (No intent change,14 days review)
Dept. Supervisor Date SRO Date FORM 5514 Station Review Copy
.. ~.. _..
_m _..._.__...;
s t*
Is a change to the Technical Specifications needed?
Yes No i/
Is the probability of an occurrence or the consequence of an accident or malfunction of equi.pment important to saf ty as previously evaluated in the_SAR. increased?
Yes
.No
/ Because:.
R
&L 5
mf Y5 d&L ev~ WJ~.
.~
Is the possibility for an accident or malfunction. of a different typje than any previously evaluated in the SAR created? Yes No v Because:
-[d
.r g.<
s w
Is the margin of safty, as defined'in the sis for any Technical Specification, reduced? Yes- -.
No-.
Becauset. - - -
Prepared By,
/>_o //
Date
/-/ 4 - 7 2__
Temporary Review Permanent Review Signature-
- Date - - Appr. - - Not ppr.
Signature Date-Appr. Not Appr.
-. - Q--..D'.
~.. $/Y) t il f
Q
...O..
E nr.
O O
Station Superintendent:
.].
If not.appro ed, explain:
.A ff &O**f HI i.
s Station Superintendent Appr. Date Effective Date (Appr. for perm. use)
(if different from appr. date)
".*NM*vh4Me.l.w - O w p
_..ee eeees,m.
_m
.,m pyg
..-.g.-
..% ass,,,g,
_,,,,,,,,