Responds to NRC Re Violation Noted in IE Insp Rept 50-293/81-25.Corrective actions:check-off Sheet Has Been Revised to Amplify Full Quorum Requirement Referenced in Text of Procedure
ML20040D787
Person / Time
Site: Pilgrim
Issue date: 12/22/1981
From: Morisi A
BOSTON EDISON CO.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20040D784 List:
References
81-294, NUDOCS 8202020252
Download: ML20040D787 (2)


Text

-N es BOSTON ED150 N COMPANY GENERAL Drrects 500 90vtaTON STnEET SQ STON MABBAcNUS ETTs 0219 9 A. V. M O R15 8 MANAGER NUCLEAR OPERATION 5 EUPPORT DEPARTMENT December 22, 1981 BECo Ltr #81-294 Mr. Eldon.J. Brunner, Chief Reactor Projects Branch No.1' Division of Resident and Project Inspection Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 License-No. DPR-35 Docket No. 50-293 Response to IE Inspection 81-25

Reference:

NRC Letter of November 24, 1981, IE Inspection 81-25 (BECo ltr #1.81.341)

Dear Sir:

This response addresses the violation identified in the Reference letter:

Violation Technical Specification 6.5. A.2 states the Operations Review Committee

.. 0RC shall be composed of..." a chairman and five members including the..." Chief Maintenance Engineer".

Pilgrim Nuclear Power Station Procedure No. 4.3, " Fuel Handling", Revision 17, paragraph VII, states " Prior to commencement of fuel' handling operations, a meeting of the Operations Review Committee shall be convened to review existing plant conditions to insure that all requirements for fuel handling are met. The quorum for this meeting shall consist of the Chairman and all members".

Contrary to the above, Special ORC Meeting 81-81 was held on October 3, 1981 prior to fuel movement on October 6,- 1981 at Pilgrim Nuclear Power Station, without the presence of the Chief Maintenance Engineer or his alternate.

Response

To preclude a recurrence of this item, the check-off sheet, Attachment 4.3.F-1 (OPER 10), has been revised to amplify the full quorum requirement which is referenced in the text of the procedure.

Full compliance has been achieved.

8202020252 820126 PDR ADOCK 05000293 G

PDR

.M

r i

CDCTON EDlION COMPANY Mr. Eldon J. Brunner, Chief December 22, 1981 Page Two Boston Edison believes this response satisfactorily addresses this issue.

Should you have further questions regarding it, please contact us.

Very truly yours, f

/[

MVEM Commonwealth of Massachusetts) c er County of Suffolk

)

Then personally appeared before me John M. Fulton, who, being duly sworn, did state that he is Project Manager - Nuclear Licensing of Boston Edison Company, the applicant herein, and that he is duly authorized to sign for A. Victor Morisi, Manager - Nuclear Operations Support and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My Commission expires: OcNedot C% /'ISS

, ofw

/