Forwards Public Version of Revision 1 to Emergency Plan, Consisting of Replacement Pages Which Respond to SER (NUREG-0420).Resolution Cross Ref List Between SER & Revised Sections Encl
ML20040D118
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/11/1982
From: James Smith
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20040D115 List:
References
RTR-NUREG-0420, RTR-NUREG-0654, RTR-NUREG-420, RTR-NUREG-654 SNRC-656, NUDOCS 8201300253
Download: ML20040D118 (3)


Text

.

LONG ISLAND LIGHTING COMPANY www SHOREHAM NUCLEAR POWER STATION P.O. Box 618, NORTH COUNTRY MOAD

  • WADING Rt'JER. N.Y.1170;r January 11, 1982 SNRC-656 Mr. Harold R. Denton, Director Office of Nuclear Rcactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Emergency Planning Shoreham Nuclear Power Station - Unit 1 Docket No. 50-327

Dear Mr. Denton:

Enclosed herewith are sixty (60) copies of replacement pages for the Shoreham Emergency Plan which was submitted to you by SNRC-56 8, dated May 27, 1981.

These pages respond to the items identified in your Safety Evaluation Report (SER),

NUREG-0420, Supplement 1. to this Jetter provides a cross reference between your SER and our revised sections.

Furthermore, in respondin'g to your SER items, we have re-evaluated the schedule for implementation of our Prompt Notifi-cation System (PSN) submitted to you in SNRC-603, dated August 20, 1981.

We are now scheduled to request proposals for the system by the end of January with placement of an order by March 1982.

We are scheduled to total system test by September 1982.

In reference to your open items on Letters of Agreement, it is our plan to update, or certify as correct, all the agreements approximately three months prior to fuel load.

This is to insure cach party's latest thoughts in the area of emergency planning.

Should you or your staff have any questions, we would be pleased to discuss them with you at your convenience.

Very truly yours,

~~

J. L. Smith Manager, Special Projects Shoreham Nuclear Power Station RWG:mp 8201300253 820119 Enclosures hLRADOCK05000 2

cc:

J. Higgins rwrm

ATTACFftEt1T 1 O

RESOLUTI0tl CROSS REFERENCE LIST SER Item Resolution Location SER' Item Resolution Location 13.3.1.3.A Cover Letter 13.3.7.3.B

p. 8-7 13.3.1.3.8 Cover Letter 13.3.7.3.C p 8-18 13.3.1.3.C Cover Letter 13.3.8.3.A pp. 7-2, 7-3, 7-3A, B, 7-5 13.3.2.3.A pp. 5-1, 5-2, 5-3 13.3.8.3.B pp. 7-2, 7-3, 7-3A 13.3.2.3.B Section 5.2 13.3.8.3.C pp. 7-12, 7-12A, B 13.3.2.3.C Tabl-5-1 13.3.8.3.D 13.3.2.3.D Figs. 3-1.1, 3-1.2, 13.3.8.3.E
p. 7-14 3-1.3 13.3.2.3.E Cover Letter O 13.3.3.3.A
p. 5-16 13.3.3.3.8
p. 6-9 13.3.4.3.A 13.3.9.3.8 13.3.4.3.B 13.3.9.3.C 13.3.5.3.A 13.3,9.3.D 13.3.5.3.B
p. 5-21 13.3.5.3.C
p. 6-14 13.3.9.3.F 13.3.5.3.0
p. 6-13 13.3.6.3.A pp. 7-6, 7-11 13.3.6.3.B
p. 7-11 13.3.6.3.C
p. 7-7A 13.3.6.3.D
p. 7-7A 13.3.7.3.A
p. 7-38 O

Page 1 of 2

i RESULTION CROSS REFEREllCE LIST O

SER Item Resolution Location 13.3.10.3.F 1

13.3.10.3.C l

13.3.10.3.H Figure 6-2 l

13.3.10.3.I Figure 6-4 l

13.3.11.3.A

p. 6-18A, Table 6-4 13.3.11.3.B
p. 6-18A 13.3.11.3.C
p. 6-18A 13.3.11.3.D pp. 6-19, 6-20, 6-21 13.3.11.3.E pp. 6-18, 6-18A 13.3.11.3.F
p. 6-20 g

13.3.12.3.A

p. 6-21A 13.3.12.3.B
p. 6-21A 13.3.14.3.A
p. 8-11 13.3.14.3.B pp. 8-11, 8-12 13.3.14.3.C
p. 8-12 13.3.14.3.D
p. 8-13 13.3.15.3.A pp. 8-2, 8-4, 8-5 13.3.15.3.8
p. 8-4A 13.3.15.3.C pp. 8-2, 8-4, 8-5 13.3.15.3.D
p. 8-3 O

Page 2 of 2