Informs That Util Has Undertaken Plant Specific Analyses to Examine Potential Reactor Vessel Integrity Concerns as Identified in NRC Generic Ltr 81-19.Program to Be Completed by End of 1982
ML20040C962
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/18/1982
From: Lentine F
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GL-81-19, NUDOCS 8201290413
Download: ML20040C962 (1)


Text

/

Commonwealth Edison One First N:tional P; ora. Chicgo. libnois

' Address Reply to: Post Othce Box 767 y

Chicago. Zinois 60690 January 18, 1982

h. Y

/%

Mr. Harold R. Denton, Director

[

N "* c.)

G\\

Of fice of Nuclear Reactor Regulation

/

A

. ' M-l!OS $ h!

U.S.

Nuclear Regulatory Commission (9

Qrv.g Yl Washington, DC 20555

\\

p.<s4

~

Subject:

Zion Station Units 1 and 2 p" I Reactor Vessel Integrity NRC Docket Nos. 50-295 and 50-304 References (a):

April 20, 1981, letter from D.

G. Eisenhut to All PWR Licensees.

(o):

May 28, 1981, letter from T.R.

Tramm to H.

R.

Denton.

Dear Mr. Denton:

In reference (b), Commonwealth Edison informed you o f our participation in the Westinghouse Owners Group program to address potential reactor vessel integrity concerns as identified in NRC Generic Letter 81-19.

The results of that program, as summarized in WCAP-10019, were transmitted to you in letter OG-66 dated December 30, 1981, from O. D.

Kingsley, Jr., to H. R.

Denton.

This report demonstrates on a conservative, generic basis that the Zion reactor vessels have a minimum of ten additional years of operation before acceptance criteria would be violated for any of the thermal shock transients considered.

As the report points out, plant specific evaluations are required to determine if remedial actions will be necessary at some point in vessel life to deconstrste continued acceptable vessel integrity.

Commonwealth Ecison has undertaken a program of plant specific analyses for Zion to examine this subject in oetail.

This program is expected to be completer. tj the end o f 1982.

Based on the results o f this program, common.aalth Edison will provide the NRC with additional detail.

Please address questions concetoing this matter to this Ve ry truly yours, N.,d -

F.

G.

Lentine Nuclear Licensing Administrator 1m 3253N 01290413 820118