MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EnlMEMidd5 P. O. B O X 164 0, J AC K S O N, MlS SIS SIP PI 3 3

EU Y

JAMES P. McGAUGHY, JR.

ASSISTANT VICE PRESIDENT

{

OUlygg x

U.S. Nuclear Regulatory Commission J4ff (Q' 877%,g IOSgg 7

Office of Nuclear Peactor Regulation Mb/#f

//

Washington, D.C.

20555 Attention:

Mr. ilarold R. Dent an, Director G,

p 2

Dear Mr. Denton:

SUBJECT:

Grand Culf Naclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/0272/15314/15601 Reschedule of Emergency Preparedness Appraisal AECM-82/37 On January 8, 1982, at the exit meeting of the NRC Emergency Preparedness Inspection and Appraisal teat, Mississippi Power & Light Company (MP&L) agreed to provide the date on which we felt a return appraisal visit should be scheduled. Since that exit meeting we have prepared a list of items which are to be addressed before the next appraisal. A copy of this list is attached.

Please note that "Date Due" normally means 100% of the procedures are to be completed and training is to be accomplished for 80% of the involved personnel by that date.

Although training for the remaining 20% of the personnel will be ongoing after that date, we feel that 80%

is the number of trained individuals who could effectively handle an emergency.

Also included with this letter is a list of those items which will not be completed at the time of the appraisal, but which we feel are not necessary to be in place at that time.

We will be prepared to undergo the next GGNS Emergency Preparedness Inspection and Appraisal by March 15, 1982.

Please review the attached information and confirm the scheduled date with us as soon as possible.

9 Yours truly, l

f b l]e:Hu l

JPM:lm Attachment cc:

(See Next Page)

A0Y 8201290039 820125

[c7 $1 1 PDR ADOCK 05000416 F

PDR AEST1 Member Middle South Utilities System

- ~ -.

+

AECM-82/37 MISSISSIPPI POWER O LIGHT COMPANY Page 2 cc:

Mr. N. L. Stampley (w/o)

.Mr. G. B. Taylor (w/o)

= Mr. R. B. McGehee (w/o)-

"r. T. B. Conner (w/o)

Mr. Richard C. DeYoung, Director (w/o)

{

Office of Inspection & Enforcement U.S. Nuclear Regulatory. Commission Washington, D.C.

20555 1^

J i

i i-I J

f 1

4 l

i i

i AEST2

A EMERGENCY PREPAREDNESS APPRAISAL PUNCHLIST f2CTION: Admin '.s t ra tive.

Item-Date Due Comments 1.

Formally appoint Site 2/15/82 Interim Emergency Preparedness Emergency Planning Task Force set up.

Coordinator, with memo to Superintendents /

j Supervisors.

2.

Establish selection 2/15/82.

criteria for Site Emergency Planning Coordinator and include in appropriate job descriptian.

Draf t revision to 3/15/82 Formal revision, to contain Emergency Plan reflecting additional infermetion, will be 1 and 2, above.

submitted at a later date.

.1 AE5Z1

EMERGENCY PREPAREDNESS APPRAISAL PUNCHLIST

'SECTION:. Emergency Organization Item-Date Due Comments 1.

Provide for MP&L technical 3/1/82 Louisiana does not want a representative to Miss. EOC.

representative.at their EOC.

2.

Provide for supplementary.

3/1/82-Mutual' aid agreement will address health physics staff beyond-this.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.

Establish provisions for 3/1/82~

meeting 30-60 minute staffing requirements of NUREG-0654, Table B-1.

l l

l AE5Z2

EMERGDiCY PREPAREDNESS APPRAISAL PUNCHLIST SECTION: ' Training 4

Item Date Due Comments 1.

Establish General Emergency 3/1/82 Preparedness-Training Program (approved procedures, lesson plans, documentation methods) for Site, General Office, and offsite support personnel.

2.

Establish Specialized.

3/15/82 Emergency Preparedness Training Programs (approved

-procedures, lesson plans, documentation methods).

3.

Establish selection and 2/15/82 qualification criteria for Emergency Planning instructors.

4.

Establish provisions for 2/13/82 training personnel on important changes to emergency procedures and equipment which occur prior to annual retraining.

5.

Establish provisions for 2/15/82

+

training emergency organization augmentation personael upon arrival at site (lesson plan, method of training, documentation).

4 i

AESZ3

~.-

~ -

EMERGENCY PREPAREDNESS APPRAISAL PUNCHLIST SECTION: Equipment / Facilities.

Item Date Due Comments 1.

Install and stock Control 2/15/82 Room emergency locker.

2.

Install addith.ual 3/1/82 l

telephones.

TC use in interim TSC and EOF.

3.

Install telephone hookup 3/1/82 l

with Administration Building radio to allow TSC-Cffsite Monitoring Team communications.

4.

Provide up-to-date records 3/15/82 If construction activities affect (i.e., procedures, drawings, security, these documents will be FSAR, diagrams, etc.) to be stored in a separate location until used in interim TSC and EOF.

security is assured.

5.

Establish provisions for 3/1/82 backup OSC.

6.

Establish and equip OSC 3/1/82 l

decontamination facility.

7.

Equip Site Access Point 3/1/82 (SAP) with instrument.

check sources, decontami-nation and first-aid supplies.

8.

Establish decontamination 3/1/82 area for SAP.

9.

Set up counting station 3/1/82 for SAP.

10.

Provide for backup SAP.

3/1/82 11.

Equip interim EOF with 2/1/82 isopleths for offsite dose assessment.

12.

Provide for dissemination 3/15/82 of meteorological data from Control Room to interim EOF /TSC until pern.anent system operable.

13.

Equip emergency facility 3/15/82 lockers, including calibrated equipment and dosimeters.

AE524

EMERGENCY PREPAREDNESS APPRAISAL PUNCHLIST SECTION: Equipment / Facilities (Cont'd)

Item Date boe Comments 14.

Install, calibrate and 3/15/82 test Area Radiation Monitors.

15.

Install, calibrate and 3/15/82 test Process Radiation Monitors.

16.

Construct and equip decon-3/15/82 tamination facility in health physics laboratory.

17.

Set up counting stations in 3/15/82 health physics laboratory.

18.

Equip medical room, 3/15/82 including emergency dos imet ry.

19.

Provide potassium iodide 3/15/82 to emergency response facilities and offsite kits.

20.

Establish and equip in plant 3/15/82 health physics emergency equipment locations.

21.

Locate extremity monitoring 3/15/82 devices in Control Room, OSC, interim TSC, health physics laboratory.

22.

Establish damage control 3/1/82 kits for OSC.

23.

Ensure alarms are operable 3/15/82 and that all areas of site are covered.

24.

Identify high noise areas 3/15/82 in plant which may require visual alarms for evacuation and fire.

25.

Establish inventory control 3/15/82 to ensure minimum stock levels of health physics supplies are maintained.

26.

Ensure availability of 3/1/82 vehicles for use in emergency response.

AE5Z5

EMERGENCY iREPAREDNESS APPRAISAL PUNCHLIST SECTION: Equipment / Facilities (Cont'd)

Item Date Due Comments 27.

Complete installation and 3/15/82 testing of security accountability system.

26.

Establish respirator SCBA 3/15/82 refill capability on site (emergency use only).

29.

Equip hospitals with 3/15/82

~

emergency supplies (meters, dosimetry, etc.).

1 30.

Stock offsite monitoring 3/15/82 field team kits.

31.

Implement dosimetry system 3/15/82 (TLD's, pocket dosimeters, extremity dosimetry).

32.

Install teleprinter line to 3/1/82 interim TSC.

33.

Install power to portal 3/1/82 monitors.

~

34.

Install shielding for 3/15/82 health physics calibration room (for dosimetry calibration).

35.

Install non-tzdiation N/A Not addressed in GGNS Emergency process monitort..

Plan; monitors nct used for evergency classification.

AESZ6

EMERGENCY PREPAREDNESS APPRAISAL PUNCHLIST SECTI0s. Procedures Item Date Due Comments 1.

Cross reference Emergency 3/15/82 Plan Procedures (EPPs) with other (non-EPP) procedures.

1.

ilst responsibilities of 3/1/82 Emergency Director which cannot be delegated.

3.

Revise notification 3/1/82 procedures to clarify g,

forms and methods to be used to notify on-call personnel.

~.:,

4.

Establish phone lists of 3/1/82 plant emergency personnel.

5.

Attach cover r.heets to 2/15/82 Corporate Emergency Plan Procedures (CEPPs) to show revision number and proper approvals.

6.

Order additional beepers 2/1/82 for on-call personnel.

/.

Issue Operations Section 3/15/82 Emergency Procedures and Off-Normal Emergency Procedures.

8.

Issue procedures for primary 3/1/82 coolant sample analysis and containment air sample analysis.

9.

Issue procedures for 3/1/82 evacuation / accountability both inside and outside security protected areas.

10.

Implement and document 3/1/82 monthly inventory of emergency lockers.

11.

Revise EPPs to address 3/1/82 quarterly review of emergency telephone numbers.

AE5Z7

EMERGENCY PREPAREDNESS APPRAISAL PUNCHLIST SECTION: Procedures (Cont'd)

Item Date Due Comments 12.

Clarify and coordinate 3/1/82 de-escalation criteria with offsite agencies.

13.

Clarify requirements for 2/13/82 training, drills, and exercises.

AE5Z8

.. ~.

)

1 EMERGENCY PF4PAREDNESS-A'PPRAISAL PUNCHLIST ITEMS NOT TO'BEl COMPLETED PRIOR--TO 3/15/82 I

Item Comment i

~ 1 '.. Class A Model Required 7/1/82 by NUREG-0654; i

see AECM-81/103, AECM-81/327, and AECM-81/350 for discussions of 9

compensating actions.

None of this system will:be in

~

place by 3/15/82,.but itsis not required to be at this time.

2.

Backup Meterological System Required 7/1/82 by NUREG-0654; see AECM-81/$03, AECM-81/327, and i

AECM-81/350.for discussions of compensating actions.

-By 3/15/82, the tower will be installed, as well as the sensors and associated data recorders.

Complete electrification of the l

system may.not be accomplished by this time.

3.

Emergency Response Facilities Required 10/1/82 by Generic Letter - 81-10; see AECM-81/25'and AECM-81/52 for ' discussions of facilities.

Interim TSC and interim EOF in use

~

at present; by 3/15/82, OSC will be completed, as will primary SAP; ERFIS will not be installed by.3/15/82.

d 4.

Post-Accident Sampling System 5% power requirement (NUREG-0831);

no compensatory actions required due to low activity which would result from an emergency prior to 5%.

By 3/15/82, hardware installation 1

l and procedures will be completed.

5.

In-Plant Damage Control Kits Security problems rel ted to ongoing construction will protibit placement i

of kits in plant at this time.

Kits will be outfitted and stored l

in interim location by 3/15/82.

i Permanent in-plant locations will be identified by this time.

1 6.

Visual Alarms for High Noise Areas Most alcrm locations will be identified; alarms may be on order by 3/15/82, but installation will i

be at a later date. This is justifiable because all high-noise arcas cannot be identifed until the power ascension startup testing phase.

.. -. - -