ML20040C395
| ML20040C395 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 12/29/1981 |
| From: | Bates J, Mcalpine E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20040C390 | List: |
| References | |
| 70-1113-81-19, NUDOCS 8201270599 | |
| Download: ML20040C395 (1) | |
Text
._
MATTRIAL TRANSMITTED HEREWTIM.
WW Q Ctc UNITED STATES o
8 7
NUCLEAR REGULATORY COMMISSION o
5 E
REGION 1.
101 MARIETTA ST., N.W. SUITE 3100 ATLANTA, GEORGIA 30303 DEC 291981 S
Report No. 70-1113/81-19 Licensee: General Electric Company P. O. Box 780 Wilmington, NC 28402 Date of Inspection: December 14-16, 1981 Type of Inspection: Unannounced Material Control and Accountability Fpy/dgr. h
/2/u/s Inspector:
0/.W tes, Senior Safeguard Chemist Date'Sigried b/-/dp [W
/A/a9
/
Aporoved
./Ll(AlpigChjie, Material Control and
- Dat6 Sigfied AccountaDiTity section Technical Inspection Branch Engineering and Technical Inspection Division Inspection Summary Areas Inspected:
Verification of export shipment of SNM including:
License review; prccessing; packaging and tamper-safing; and SNM verification.
The inspection involved 29 inspector-hours by one (NRC inspector and.was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements. in the I
one area examined during the inspection.
S-F2 b/
Copy </
of.6 Copies 5
Passes This Document in not to be reproduced without specific approval of IE:II 8201270599 811229 DR ADOCK 07001113 MArraiAt TaANSMfTTTD Nttnm?H C
PDR C NTAIN3 2Jp0 tNfoR.YAllg4
_ _ _ _ _ _