Responds to Recent Inquiries Re Emergency Manpower Augmentation Policy.Statement Re Intent to Implement NUREG/0654 Section II.B.5 Criterion Encl
ML20040C313
Person / Time
Site: Dresden, Hope Creek, Byron, Braidwood, Quad Cities, Zion, LaSalle, 05000000
Issue date: 01/19/1982
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8201270518
Download: ML20040C313 (2)


Text

-

/

\\ Commonweilth Edison 4

/

) ons First Nitiorul Plaza. Chic 4tgo, Illinois k O 7 Address Reply to: Post Office Box 767

/ PRINCIPAL STAFF

(_,/

Chicago, Illinois 60690 y 61 IE d &TS 11

, pao 7/n A/D 1to DP&PI January 19, 1982

- 7E&TI

+l dEP&OE D

w Mr. James G. Keppler, Regional Administrator A

3 Directorate of Inspection and Enforcement - Region III

[

IIECS SD 6

U.S. Nuclear Regulatory Commission A~'

-]

dUl2 719826 I 799 Roosevelt Road Glen Ellyn, IL 60137

.T I

  1. 9*?SU::tra,$a"
  • f'h

Subject:

Emergency Manpower Augmentation Poli b-Generating Stations Emergency Plan (G Dresden Station Units 1, 2,'and 3; M

0 Quad Cities Station Units 1 and 2; Zion Station Units 1 and 2; LaSalle Station Units 1 and 2; Byron Station Units 1 and 2; and Braidwood Station Units 1 and 2 NRC Docket Nos. 50-10/237/249, 50-254/265, 50-295/304, 50-373/374, 50-454/455/456/457

Dear Mr. Keppler:

In response to inquiries from your staff (Mr. W._Axelson, et. al.) relative to the Commonwealth Edison policy for emergency manpower augmentation, the enclosed statement is provided.

Commonwealth Edison will develop an administrative policy to implement the criterion stated in NUREG-0654 Section II.B.5 that "the licensee must be able to augment on-shift capabilities within a snort period af ter declaration o f an emergency".

Commonwealth Edison accepts and shall pursue as a goal a 30 and 60 minute augmentation objective.

These fixed time periods have been acknowledged by the NRC Executive Director of Operations (E00-W.

J.

Dircks) to be goals and not rigid guidelines subject to enforcement.

Our policy will be to adhere to the position taken in Reference (1) by the EDO as evidenced by the attached policy

~

statement.

We will keep you advised o f our progress in implementing and assessing the adequacy of this policy.

If you have any further questions, please direct them to this o f fice.

Very truly yours,

{

Y$

p L. O. DelGeorge Director of Nuclear Licensing Enclosure cc:

Resident Inspector - D/QC/Z/LSCS/B-B ho$0 0

JAN 2 i y

e s

-+

4

'4, T

Commonwealth Edison Company

+

Emergency Augmentation Policy i

c NUREG 0654 Criterion II.B.5 ' states that "the licensee must be able to augment on-shif t capabilities.within a short period af ter declaration o f an emergency."

It 'further defines that short period as 30 and 60 minutes.

CECO-. considers these timeframes ' to be our goal for augmentation.

However, CECO. can no t. commit to rigid, inviolate times due to the diversity of -residential patterns' for the stations' staffs, possible adverse-weather conditions, and possible road congestion.

We. believe this position is. consistent with that l

o f, the NRC.

i L

To facilitate meeting this commitment, CECA. will establish a 24-Hour duty-call individual who wo,uld be notified first af ter a l

station emergency. -This individualJwould initiate a pIloritized notification (call-list) procedure.

This procedure will identify individuals who are capable of f ulfilling the specific' response functions which areLlisted in GSEP Figure 4.2-3, Guidance for Augmentation of the-Onsite Emergency Organization within 60 minutes. ' GSEP-Figure 4.2-31was developed based on the functions listed in Table-B-1 o f NUREG '0654.

- The call-list procedures are

~

prioritized by least travel time of station staff.

I In' addition' each station will-initiate unannounced offshift notification drills at least_every six months.

These.

drills will involve implementation of the individual station's call-tree' procedure 'and documentation'of the times at which persons are

-notified.

This drill will serve to demonstrate the capability-to augment the onshif.t staf f in a short period afeter rdeclaration of an i

emergency.

t For activation o f the EOF, CCCo. is developing a prioritized Recovery Manager. notification list.

This call list will i

enable the responsible corporate Duty 0ffice. to notify the Recovery Manager who would require the least travel time to a particular i-EOF. - Consistent with our onsite augmentation goal, we will activate

the EOF as promptly as possible when necessary.

~

1 k.

1 Position _was so stated in Letter, Dated 10/26/82, from 41. J. Dircks o f NRC to Dr. D. F. Knuth o f KMC, Inc.

0-

'3270N-i 4

4

.J n.,

a-

-n-

+. -, -. ~,..

. -,