ML20040C249
| ML20040C249 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 01/05/1982 |
| From: | David Jones, Mcalpine E, Richards B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20040C244 | List: |
| References | |
| 70-1151-81-19, NUDOCS 8201270449 | |
| Download: ML20040C249 (1) | |
Text
hATU;lAt IRAfdM! tit 0 R:REWITH CONTAINS 2J90 INf0RMAliON UNITED STATES 8
'o,,
8 NUCLEAR REGULATORY COMMISSION o
E REGION 11 b[
101 MARIETTA ST., N.W., SUITE 3100 o,
ATLANTA, GEORGIA 30303 o
JAN 51882 Report No. 70-1151/81-19 Docket No. 70-1151 License No. SNM-1107 Safeguards Group No. III Licensee: Westinghouse Electric Corporation Drawer R Columbia, SC 29250 Date of Inspection: December 14-18, 1981 Type of Inspect, ion:
Unannounced Material Control and Accountability Inspectors:
[ bum
/
f7 D. W. Jones, Statistician Date Signed R / &/b4 i /s /r2 B. L. Richards, Statistician Date Signed bDW Od
! b82_
Approved by: E. J. McAlpine, Chich>, Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Inventory difference and its associated limit of error.
i The inspection involved 56 inspector hours on site by two NRC inspectors.
The inspection was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the area examined during the inspection.
W-5 3
or #
Cop 5 C or.7b Pagoi This Document is not to be reproduced without specirlo approval of IE:II I
l l
8201270449 820105 m it^nwTro metymn i
PDR ADOCK 07001151 AWS 2J90 f0MAM C