Forwards Ws Hazelton & Cd Sellers Testimony Re Turbine Disc Cracking & KM Campe Testimony on Effect of Recent Westinghouse Turbine Cracking Experience on Estimated Historical Turbine Failure Rate
ML20040B859
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/22/1982
From: Mcgurren H, Swanson D
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Buck J, Quarles L, Rosenthal A
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
Shared Package
ML20040B860 List:
References
ALAB-589, ISSUANCES-OL, NUDOCS 8201260485
Download: ML20040B859 (2)


Text

- - _ _ _ -.

, f.t># KEGgIo

+

UNITED STATES g

y NUCLEAR REGULATORY COMMISSION M

S e o

0 WASHINGTON, D. C. 20555

'(

d{

v p

v, h

January 22, 1982 gq 2

2 b

lll s

s 4

'N Alan S. Rosenthal, Esq., Chairman Dr. John Buck s,4 d'

s Administrative Judge Administrative Judge

"' / i V \\

Atomic Safety and Licensing Appeal Atomic Safety and Licensing Appea Board Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C. 20555 Dr. Lawrence R. Quarles Administrative Judge Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 In the Matter of Virginia Electric and Power Company (North Anna Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-338 0.L. and 50-339 0.L.

Gentlemen:

Enclosed is a copy of the NRC Staff's proposed testimony filed in response to the Appeal Board's Memorandum and Order of April 7,1980 (ALAB-589), in which the Staff and VEPC0 were directed to produce 1) testimony addressing the impact of the turbine disc cracking phenomenon on testimony filed in the Spring of 1979 regarding the risk of turbine missiles at North Anna 1&2, as well as 2) a discussion of the disc crack-ing problem and steps being taken to correct the problem. This testimony consists of the following:

1.

"NRC Staff Testimony of Warren S. Hazelton and Clifford D.

Sellers Regarding Turbine Disc Cracking", and 2.

"NRC Staff Testimony of Kazimieras M. Campe On The Effect Of Recent Westinghouse Turbine Cracking Experience On Estimated Historical Turbine Failure Rate."

Copies of professional qualifications of Messrs. Hazelton, Sellers and Campe are attached to their testimony.

The Hazelton/ Sellers testimony addresses the general matter of turbine disc cracking, the work that has been done to assess the cause of the cracking, and the disc inspection program which has been implemented to prevent disc cracking from causing disc failure. The Campe testimony addresses the relationship between the resolution of the disc cracking problem and the estimated turbine failure probabilities presented in the Staff's previously filed testimony on the North Anna 1&2 turbine missile DESIGNATED ORIGIliAIi 8201260495 820122 PDR ADOCK 05000 Certified By L

b 0 ] 3, 7

s risk. Mr. Campe concludes that the previous estimates regarding the historically determined turbine failure probability (p.1) are still valid.

The Staff would propose to make these gentlemen available for Appeal Board questioning regarding their proposed testimony in the event that the Appeal Board determines that a hearing is necessary on the issue of turbine disc cracking.

Sincerely,

[

Daniel T. Swanson Counsel for NRC Staff

$(:[ut (%~

9 a7 Fenrt y. McGurren Counsel for NRC Staff cc: w/ encl. Michael W. Maupin w/o encl. Rest of Service List l

, - - - - -