ML20040B763
| ML20040B763 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 01/13/1982 |
| From: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8201260393 | |
| Download: ML20040B763 (3) | |
Text
r 0
UbIfRC R
, n >yra ' NGf 4 t 4.
SOUTH CAROLINA ELECTRIC a GAS COMPAI,Y
~
post orrics som 7s4 C""*Pj#fl{t" M"! "f i T. C. NICHOLS, J n s
January 13, 1982 v.u em,m, = caou cucona naa..om.ne-
.i y
y James P. O'Reilly, Director
- 7,2m, {f.
U. S. Nuclear Regulatory Ocarmissian m
Region II, Suite 3100
. ;;;y j, 101 Marietta Street, N. W.
g Atlanta, GA 30303 O
\\
Subject:
V. C. Sunmer Nuclear Statici Docket No. 50/395 ITE 71ansfer Switch Failure Significant Deficimcy Final Report NE File:
3.1051
Dear Mr. O'Reilly:
01 nly 28, 1981, Mr. Virgil Brownlee of NRC Regial T.I was notified of a potmtial significant deficielcy or potmtial shstantial safety hrard calcerning an ITE interrupter switch, at June 29, 1981 an Interim Report was seit to Mr. O'Reilly.
Initially this item was idestified as a problem with m interrupter switch. 'Ihe actual problen was or a transfer switch which is similar to the interrupter switches. 'Ihe switches are described in the manufaturer's literature as interrupter switches.
SCE&G Nuclear Ehgineering has reviewed the problem md cmsideral both Brown Boveri Electric, Inc. recommdatiois and SCE&G operatims nnintmance ocncerns. 'Ihe conclusions of the review is that the above iten is a significant deficielcy under 10CFR50.55(e). 'Ihe details of the item are attached. '1his is cmsidered a final report of the nutter.
Very truly yours,
/
T. C. Nichols, Jr.
'IB:'ICN: tdh A'I'rACHMENT OFFICIAL CO 8201260393 820113 PDR ADOCK 05000395 JL G PDR S
$//
Mr. James P. O'Reilly Page two January 13, 1982 l
cc:
J. P. O'Failly V. C. Suimar T. C. Nichols, Jr.
G. H. Fischer H. N. Cyrus H. T. Babb D. A. Nauman M.
B., Whitaker, Jr.
N. A. Williars, Jr.
O. S. Bradham R. B. Clary M. N. Browne A. R. Kool H. Radin O. W. Dixcn, Jr.
Site Q. A.
G. J. Braddick J. K. Skolds J. B. M1otts, Jr.
B. A. Bursey J. C. Ruoff I&E (Washingtcn)
Documelt Rnagemit Branch
- (55e, 21, LER coly)
NPCF File
-m, u
10CFR50.55(3) - SIGNIFICANT DEFICIENCY j
1.
Ideltificaticn of Ncncxnformance he ITE transfer switch that feeds marging/ Safety Injecticn Pump (XPP-43C) notor failed to properly close, thus causing the feed to single phase and the notar failed to start.
2.
Number and Iocaticn of Ncnconformance Switch XET-2002C Auxiliary Building 388 level 3.
Significant Deficielcy Created and Evaluaticn i
che blade of the ITE switch failed to close, thus cnly two phases of power were fed to the 3 phase Pump notor. %e motor failed to start, thus me of the three Charging / Safety Injection Pumps was out of service. Ioss of the marging/ Safety Injecticn Pump oculd result in failure of the safety injecticn systen if another single failure were to occur. Inspecticn of the connecticns to the switch blades revealed that insufficielt targue cn the holding nut md misalignmatt of the min switch blade caused the problem.
1 4.
Corrective Acticn Transfer switches and speed switches with similar connections be inspectel to assure proper connecticns. Apply proper torgue i
value at not connecticns aid assure the switch min blades are properly aligned.
f
[
t h
l r
o i
i l
t l
r x.
-.... -.. _,. _ _ _ _ _.. _ _ _., _