ML20040B691
| ML20040B691 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/19/1982 |
| From: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| To: | Clark R Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM NUDOCS 8201260322 | |
| Download: ML20040B691 (2) | |
Text
.
B ALTI M OR E GAS AND ELECTRIC CHARLES CENTER P. O. BOX 1475 BALTIMORE, MARYLAND 21203 ARTHUR E* LUNDVALL,.jp Vic e Pret & DE p.f su -a,
January 19, 1982 s h Office of !!uclear Peactor Pegulation s'
U.S. !!uclear Pegulatory Commission
?
\\
Washington, D.C.
20555 I
Attn:
I'r. R. A. Clark
'I Cperating Frictors Franch #3 Division of Licensing
Subject:
Calvert Cliffs I;uelear Power Plant l' nits I:os. 1 & 2, Lockets I!os. 50-317 & 50-318 Response to IIITEG-0737 Tten II.F.1. 7 Gentlemen:
The installation of containment water level monitors is required by filmEG-0737. We have installed this system at Calvert Cliffs, but after an initial period of successful operation, erroneous level indications are being received.
Consultations with the instrument manufacturer have led us to believe that the spurious indications are caused by air entrapped in the accociated capillary tubing.
Thermal expansion of this air causes extension of the remote sensing bellows; excessive extension results in the bellows
" bottoming out" in its housing.
Further air expansion produces a pressure signal at the transmitter with resultant erroneous level indication.
We plan to replace the bellows housing with one of improved design and to replace the fill fluid with a better-deaerated type. This work is currently scheduled for the upcoming refueling outages (April 1982 for l' nit 1, October 1082 for Unit 2).
If you have any questions in this matter, we vould be plecsed to discucs it with you.
Very truly youre [
/
/
( l l
- zyn
' 'i ' l *
~
t I
p1L c/
AEL/ITP:gvg 8201260322 820119 PDR ADOCK 05000317 p
i I
L
+
i I
Mr. R. A. Clark January 19, 1982 Page Two j
l l
a i
i cc:
J. A. Biddison, Esq.
G. F. Trowbridge, Esq.
Messrs. D. H. Jaffe - NBC R. E. Architzel - NRC bec: Messrs. A. E. Lundvall, Jr.
I R. H. Kent /C. H. Cruse S. A. Rittenhouse J. A. Tiernen G. C. Creel l
R. M. Douglass R. F. Ash / File L. B. Russell /W. S. Gibson l
R. E. Denton/D. W. Lathan R. C. L. Olson A. R. Thorton l
J. M. Dahlquist, Jr./H. B. Wylie, III l
K. H. Sebra i
L. E. Sundquist J. T. Carroll /R. P. Heibel l
M. D. Patterson j
W. L. LeConte (3)
P. W. Kruse - CE
}
J. C. Ventura - Bechtel t
p i
l l
t i
i re
_