ML20040B687

From kanterella
Jump to navigation Jump to search
Notice of Nonconformance from Insp on 811027-30
ML20040B687
Person / Time
Issue date: 01/06/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20040B681 List:
References
REF-QA-99900743 NUDOCS 8201260317
Download: ML20040B687 (1)


Text

.

Brown Boveri Electric, Inc.

Distribution Apparatus Division Docket flo. 99900743/81-02 APPEllDIX A Il0TICE Of fl0f1C0flFORMAflCE Based on the results of an flRC inspection conducted on October 27-30, 1981, it appears that the following activity was not conducted in accordance with f1RC requirements:

The Brown Boveri Electric, Incorporated, Switchgear Systems Division's corrective action response letter dated April 8,1981, states in part:

"All personnel performing final test functions will report directly to the Quality Assurance Department during the performance of those functions when Certificates of Canformance are required.

"The enclosed organization chart shows this change.

This change be-came effective April 1,1981."

The enclosed organization chart depicts a bloc'K identified as:

Final Test, reporting to the QA Manager Contrary to the above, the revised organization chart had not become effective April 1,1981; as evidenced by an undated organization chart incorporated into the QA Manual and QA Procedure.

The incorporated organization chart did not depict a block identified as " Final Test," such as was depicted in the chart provided with the corrective action response letter.

8201260317 820106 PDR GA999 ENVDDC 99900743 PDR

__.