.=. _ _ = - - _ -._.
Dockeb Nos. 50 l+60/513
,Y vd 50.55(e) Report phE![ED I
Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashington Way Richland, Washington 99352 (509J3g5 b !): 3'.;
December 28, 1981 GO-1-81-431 NOlG;; r,;
i Nuclear Regulatory Commission
[k.N' i
Region V i
1450 Maria Lane, Suite 210 N
Walnut Creek, California 94596 Attention:
Mr. R. H. Faulkenberry c
.P9 3 ~ EO Chief, Reactor Construction
'7 Projects Branch
., ' ~
Subject:
SUPPLY SYSTEM NUCLEAR PROJECTS NOS. 1 AND 4 j
DOCKET NOS. 50-460 AND 50-513 K,f' REPORTABLE CONDITION 10CFR50.55(e) j INDUCED NEUTRON FLUX ERROR - INTERIM REPORT l
Reference:
1)
Telecon, TJ Houchins, Supply System to DF Kirsch, Region V Nuclear Regulatory Commission l
dated November 13, 1980 1
2)
Letter, DW Mazur, Supply System to RH Engelken, NRC, same subject, dated December 12, 1980 j
3)
Letter, DW Mazur, Supply System to FH Faulkenberry, NRC, Same Sabject, dated July 28, 1981.
In reference (2) the Supply System reported the existence of a reportable condition (10CFR50.55(e)) to the NRC. The concern related to errors in the measurement of core neutron flux during certain postulated acci-dents. In reference (3) we provided an interim report on this item.
The status of the resolution of this concern to date is as follows:
Status There are two potential resolutions to this concern.
They are: (1) l a hardware change providing an alternate measurement of core power, i
and (2) new analyses confirming the acceptability of the present design.
In Dece7,oer, Babcock & Wilcox completed their initial evaluations of the feasibility of both of these potential resolutions.
It appears that either method is feasible. Babcock & Wilcox is to make their i
formal recommendation as to the desired resolution in January 1982.
i (En 8201260116 811228 PDR ADOCK 05000460
$/.
S PDR l
6/-95
-\\
a 6
~
R. H. Faulkenberry Interim Report Page Two We expect to provide your office with a report describing the resolution of this concern by March 3, 1982.
N' D. W. Mazur Prigram Director WhP-1/4 CRE:MER:lm cc: CR Bryant, BPA/399 V. Mani, UE&C/897 RR Steinke, B&W