January 6, 1982 O
TABLE OF CONTENTS Number Title CC-1 The Corporate Command (Rev.8, Aug. 1981)
Center Director CC-1A Corporate Command Center (Rev.0, June 1980)
Director - Hazardous Material Release CC-2 The Corporate Command Center (Rev.3, Jan. 1981)
Intelligence Director CC-3 The Medical Director (Rev.2, Jan. 1981)
J CC-4 Information Direer.or (Rev.2, Dec. 1980)
CC-5 The ERP Director (Rev.0, Dec. 1980)
CC-6 The Manpower and Logistics Director g)
(Rev.2, Dec. 1980)
CC-7 The Communications Director (Rev.3, Jan. 1981)
CC-8 The llealth Physics Director (Rev.0, Jan. 1981)
CC-9 The Accounting Director (Rev.2, Jan. 1981)
CC-10 The Legal Consultant (Rev.2, Jan. 1981)
Page 1 8201250156 820118 PDR ADOCK 05000010 p
January 6, 1982 TABLE OF CONTENTS (Continued...)
Number Title CC-11 The Engineering Director (Rev.2, Dov. 1980)
CC-12 The Syrtem Power Dispatcher (Rev.6, Jan. 1981)
CC-13 The Exercise and Drill Program (Rev.0, Jan. 1981)
CC 14 Offsite Communications Capabilities (Rev.0, Jan. 1981)
CC-15 The Division Director (Rev.0, Jan. 1981)
EOF-1 The Recovery Manager (Rev.2, Aug. 1981)
EOF-2 The Technical Support Manager (Rev.1, Dec. 1980)
EOF-3 The Environmental / Emergency Coordinator (Rev.1, Dec. 1980)
EOF-4 The Emergency News Center Director (Rev.1, Dec. 1980)
EOF-5 The Design and Construction Support (Rev.1, Dec. 1980)
Manager l
EOF-6 The Administration and Logistics Manager (Rev.1, Dec. 1980)
EOF-7 The Scheduling / Planning Manager (Rev.1, Dec. 1980) l EOF-8 The Waste Systems Radiation Control (Rev.2, Dec. 1980)
Manager EOF-9 Recovery Operations l
(Rev.0, Feb. 1981)
EOF-10 The Advisory Support Director (Rev.0, Feb. 1981)
("')T 4
\\_
EOF-ll Training Director (Rev.0, Jan. 1981)
Page 2
January 6, 1982 i
TnBLE OF CONTENTS (Continued...)
Number Title EOF-12 Access Control to the Emergency (Rev.1, Oct. 1981)
Operations Facility and Corporate Command Center.
EOF-13 Activation of the Westinghouse Nuclear (Rev.0, Nov. 1981)
Training Center as Nearsite EOF for Zion Station.
EOF-14 Activation of the General Electric (Rev.0, Ecc. 1981)
Nuclear Training Center as Nearsite EOF for Dresden Station, i
v f
l 1
f
'v' Page 3 1
l
EOF-12 Revision 1 October 1981 i
GENERATING STATIONS EMIRGENCY PLAN IMPLEMENTING PROCEDURE EOF-12 ACCESS CONTROL TO THE EMERGENCY OPERATIONS FACILITY AND CORPORATE COMMAND CENTER O
Prepared by:
N Date:
II~ 2 I/2 U /' _
Reviewed by:
/[
1 T/ <
Date:
Approved by: /
h Date:
// /70
/
f5569A O
l EOF-12 3
Ravision 1 October 1981 A.
PURPOSE The pupose of this procedure is to outline the methods to control access to the nuclear stations' Nearsite Emergency Operations Facilities (EOF) and to the Corpoorate Command Center (CCC).
B.
REFERENCES l
GSEP Sections 7.1.4 an.) 7.1.5.
C.
PREREQUISITES None.
l D.
PRECAUTIONS None.
E.
LIMITATIONS AND ACTIONS l
l None.
I F.
PROCEDURE l
1.
Access control and security at a nuclear statio 's
()
Nearsite EOF is the responsibility of the Staticn Security Director.
a.
Notification of the Security Director of activation of the EOF and the need for access control should come from the Station Director after communication with the Corporate Command Center Director.
b.
The Security Director will assign security personnel to be stationed at the EOF.
These assigned personnel will function per standard security procedures and as specified below.
c.
Security personnel will limit initial entrance to the EOF to Commonwealth Edison personnel.
d.
After the initial manning of the EOF, access will be limited to personnel approved by the Recovery Manager or the senior Edison official at the EOF, if the Recovery Manager is not yet present.
Media personnel will be directed to the designated e.
Emergency News Center entrance at the EOF.
()
Page 1 of 2 i
EOF-12 R vision 1 October 1981 F.
PROCEDURE
(
')
U f.
Generally, persons who will be granted access to the EOF will be Edison personnel, NRC representatives and State officials.
In all cases, entrance must be approved by the Recovery Group Manager, either by prearrangement or at time of arrival.
2.
Access control at the CCC will be the responsibility of the CCC Director.
a.
He should appoint an individual to control entrance I
to the CCC.
This individual should be someone other l
than a GSEP organization Director.
b.
Due to limited space in the CCC, numbers of personnel must be strictly limited. All personnel having access to the CCC will be as approved by the CCC Director, either by prearrangement or at the time of arrival.
c.
Media personnel will be directed to an area other than the CCC and will be addressed by the Information Director in this area.
G.
CHECKLISTS l
I s-
/
No e.
11.
TECHNICAL SPECIFICATION REFERENCES None.
,O Page 2 of 2 LJ 1
1 l
l
EOF-13 Revision 0 November 1981 O
i GSEP CORPORATE COMMAND CENTER EMERGENCY PLAN IMPLEMENTING PROCEDURE EOF-13 1,
ACTIVATION OF THE WESTINGHOUSE NUCLEAR TRAINING CENTER AS NEARSITE EOF FOR ZION STATION O
Prepared by:
b, FASTER $
Date:
I/~1-I!
(
/.
Reviewed by:
k- 'O/
/ / //c Date: // - /< ' - I' /
///7o![/
Approved by:
Date:
45329A O
EOF-13 R* vision 0 November 1981 1
A.
PURPOSE Provide for an orderly and disciplined takeover of the Westinghouse Nuclear Training Center (WNTC) in the event of Generating Station Emergency Plan (GSEP) implementation in response to an emergency condition at Zion Station requiring activation of the Emergency Operations Facility (EOF).
B.
REFERENCES 1)
Generating Stations Emergency Plan - Zion Annex, Section 7.1.5 C.
PRERFfiUISITES 1
Agreemsnt between Commonwealth Edison Company and Westinghouse Corporation exists allowing CECO to utilize the WNTC as an interim EOF until the final EOF is completed on a "not to interfere with student training" basis for drills and exercises.
In the event of an actual incident at Zion Station requiring full activation of the EOF, it is understood that CECO would be allowed use of the WNTC in its entirety.
D.
PRECAUTIONS 1)
None.
%)
E.
LIMITATIONS AND ACTIONS 1)
When activated for exercises or drills, the WNTC may not be utilized by CECO to the full extent described in this procedure.
i F.
PROCEDURE 1)
The CECO Nuclear Duty Person, af ter being informed of the condition at Zion Station will, as part of his notification duties, call the WNTC at (312) 872-4585, explain the situation and inform the Training Center manager or his Cognizant Person that CECO is activating the WNTC as the EOF.
(This notification may be made directly by the station or in person by the Environs Director if the situation requires immediate activation of the EOF.)
i Page 1 of 4 I
EOF-13 htvision 0 November 1981 F.
PROCEDURE (Continued...)
V 2)
The WNTC Manager or his Cognizant Person will take the following action:
a.
If the situation is such that an evacuation of the immediate area around Zion Station is imminent, WNTC staff and students will leave the center and report to an appropriate assembly area such as the City of Zion Emergency Operations Center (EOC). The exact assembly area will be determined at the time of notification. An appointed individual will remain at the WNTC to acct as liaison with CECO personnel.
This individual will also maintain responsibility for the training reactor located at the center.
b.
If evacuation is not imminent, then the WNTC manager or his Cognizant Person will make immediate 4
arrangements to provide use of the following areas to CECO (See attached floor plan) :
4 1.
Lounge - Mair. Communications Center 2.
Classroom #1 - Directors / Technical Work Center 3.
Classroom #2 - Briefing Room 4.
Classroom #3 - Support Organizations Work Center
~
5.
General Office Space - Nuclear Regulatory
()
Commission The continuance of student instruction and simulator c.
training will be dependent upon the extent of EOF activation, the magnitude of advisory support necessary, the amount of space available and accessibility of the area around Zion Station.
3 3)
The following communications will be provided in support of the expansion plan:
Six business lines will be provided to classroom #1 a.
from the demarcation boxes in the lounge:
1.
746-3530 2.
746-3823 3.
746-5250 4.
746-3304 5.
746-2275 6.
746-9327 i
b.
Two station extensions will be provided to classroom
- 1 from the demarcation boxes in the lounge:
1.
580 2.
581 O
Page 2 of 4 i
EOF-13 Ravision 0 November 1981
()
F.
PROCEDURE (Continued...)
c.
The WNTC is equipped with a public business exchange consisting of six Illinois Bell business lines and six WIN lines (Westinghouse's long distance trunk-line network). The exchange has approximately 125 stations located throughout the center available for use.
4)
Control of the WNTC will be returned to Westinghouse when need for activation of the EOF is no longer necessary.
G.
APPENDIX 1)
Figure Pl - Floor plan of Westinghouse Nuclear Training Procedure.
H.
TECHNICAL SPECIFICATION REFERENCES 1)
None.
O Page 3 of 4 0
~-
6,1Wlm
-- ~
--n
~
e/.4..> -@ @j":;y
(.
O 4
gy.y3 17 4??
I.q r
n c. t.
{r-o. QpP q
uv. o ce s ;,
+
. q(..
_m 4[1 it' -
gy, Asl g
g I
l 3
{
.r.
n
-e
.,_q
.l g
y
, -,...,. -...,,..,,, m s
n n
3.ca m. e,.
t i
. L i
s[.
y;
__ j, i'd 9,,. +,.,,.3
-4 g
t p '. _;p..
. [, a g
_ i l_. ! ?.
y N
e 4
3
~
- u
-k C.g J
i g
f.T, ll lg ;- ';
t i
%, 7.-pe g
- n
.s sy
_ h-- ' M hy F
I ',
e
\\
I~
3 I 8't.
U
-, t.. -
s
.. c n...
I, b.
e' d H i
s
- m. -
.r.m '
j; i.
l t'
hl i
' p,Ik_,j.j h. dji I
lI il s -
j _ _s L h =.=.
-2 i i-8{
l'.g
.gI:
9 s
M
, h--
, p- - - Y3.p,7..'.(p
]f e
- I.!..d.
i.\\
-f -
. E' y l-i
(,g,. lh 'jl 3a li. W ['~
I =~=' FG f
l ll
- $.e 7 @7 7 :
.i l t ; g.l
( (-_ _. o;
. n e
i
[i; ]
r-.
inii n ' :
y j2c..-e.
, NE
$;/
4 5 t'
- l' 6
i d'
i 1
J 9.i
, i ;3 W
4/g:
.r
' !;;;p},h 3
- s,_.. s.
4 6
w. e. g.e
],m, y<g3g,,y.
=-
I D,
-s2 y
i
-m
!.....!! ::i lill!!k.'..{dtg -
-(
U-)'51.
w a __g ;
'o. r y I 'g f _. d
- 1,._E 4, 7*g -(g
'i l,6. ',d,!
M-an i
s t
a v
.-14-_..
+
i,. EN{7.
1-.
d '-= 1S {
l j
.e
^_,a'-
g l l, g
- h
,, k8,;,,, -- e.
I
.I 1 : l,
--l - (
N ll
- 4 3.r4+*-
1
{
{
s y-(>
g*
l' I g I I l'l f l l II 41 I. m
. 1-b--.j 3
s 4
j gg i
71
- f'
.I
'I 8 0 1
M M [_ gl
- t i
I f
=
j;
~~ '
~.
- I]I b
b h' 1;l l g.:
~
1 m._ _, __ _
, p. %
_(o.-. j 1 11 lt:,Ill ih,'
e
.+
ys y
g
-p g _
iIe e
p
- "y-
,1...,=.
--g--
,,,^-
4.# e T S--
c 3
Iir aosn YL --.t..:gd&
G;.. '..*.
T'~ ~
i l
~g
' *S' w,
- a d.
w 7
u 1
f M. :. _
4
'1 b.[
i N:i
.l. s'1', l!
[~
- b.,;., h :h, e H:. :. # 9 h.ik w. P%
.E! 1 - i '--Ow;-H,D
.l
_li 1 v
p.I1,;
pp
--4 i,-
?
t,o,p ii yi,,
7.~ y
+-
r gjij,\\.t A.i.:.
n.e.,
x tp _.s~
s-pan _. ] j'.: g gJ g
g q>.
g
_ y e y, m.n p
p..a.
1 9
s'r=r_.==.
3e a.
n i
,p t
- f.,
tV
, j 3,!. i,-l.; tg n_.
'I-^
.-[
, 7.
_r I
ii! 13 1 j
i
,27,. e
_. # s:.~
f f,!! pe [i hj' ly I
1 i
I f
3 I8 j
!i 4..._-
i,-, e i
2,
- p[',5llllf[i,iji,
_A V l
t!!g Ill y,,. i 2. *-
_1.
_... o. - -
-. = = 4 '*'
V 4
- C3 i
Flu.r, i
4 t-u Qe t,;. :ll :
1 ri r l
l M.e =g&}4 i :
UHib'biibg by!
'i i
g3e l
,[ ; r GG..^-
T-A i
i t
l j
9 2-p
=-
,p,h O.
0,,;
i i
)
W6 di i
o,.m n-
...1,
,,q,....
4...:.+
m.-. g,.. !'
g G
G e
e e
.- F E.4
.n m
.u...
v1 k-he3e. 4 4 4
t 9
EOF-14 Revision 0 December 1981 gs, O
GSEP CORPORATE COMMAND CENTER EMERGENCY PLAN IMPLEMENTI!JG PROCEDURE EOF-14 ACTIVATION OF TiiE GENERAL ELECTRIC NUCLEAR TRAINING CENTER AS NEARSITE EOF FOR DRESDEN STATION
("%
1
/
Prepared by:
w g
Date: /2- //- I/
Date: /J ' / ','/- I ' /
Reviewed by:
Approved by:
w,/r//
k[h.'
Date: 11 //s23' /
- 5762A C\\
V
m I
ig j
EOF-14 Revision 0 December 1981 j
A.
PURPOSE 1
i Provide for an orderly and disciplined take over of the General l
Electric BWR Traiaing Center (GEBWRTC) in the event of an emergency condition at Dresden Station requiring activation of
]
the Emergency Operations Facility (EOF).
B.
REFERENCES l
1)
Generating Station Emergency Plan - Dresden Annex, Section 7.1.5.
j C.
PREREQUISITES i
Agreement between Commonwealth Edison and General Electric i
Company exists allowing Ceco. to utilize a portion of the j
GEBWRTC as an interim EOF until the final EOF is completed on a j
"not to interfere with student training" basis for drills and exercises.
In the event of an actual incident at Dresden Station requiring full activation of the EOF, it is understood 1
that adequate space within the GEDWRTC will be provided to CECO., allowing use of the Training Center as the EOF.
This 1
I procedure provides the direction for utilization of those areas provided.
]
D.
PRECAUTIONS l
1.
None.
1 E.
LIMITATIONS AND ACTIONS l'
l.
When activated for exercises or drills, the GEBWRTC may not be utilized by CECO. to the full extent described in j
this procedure.
3 F.
PROCEDURE 3
j 1.
The CECO. Nuclear Duty Person, after being informed of the emergency condition at Dresden Station will, as part of j
his notification duties, call the GEBWRTC at (815) i 942-5790, explain the situation, and inform the Training j
Center manager or the GE Duty Person that Ceco will be
}
activating the GEBWRTC as the EOF.
(This notification may be made directly by the station or in person by the
}
Environs Director if the situation requires immediate activation of the EOF.)
1 O
1 Fage 1 of 2 t
i
g EOF-14 Revision 0 December 1981 2.
When informed that' activation of the GEBWRTC as the EOF is necessary, the Training Center manager or the GE Duty Person will make access to the following spaces in the classroom area available to CECO.
(See attached floor plan);
a.
Display Area - Main Communications Center b.
Classroom A - Director / Technical Work Center c.
Classroom B - NRC Office Space d.
Classroom C - Support Organizations Work Center e.
Classroom D & E - Work Centers as needed f.
Classroom F - Joint Press Information Center 3.
The continuance of student instruction and simulator training will be dependent upon conditions relative to the situation at Dresden Station and the accessibility of the surrounding area.
4.
Return of the spaces provided to CECO. will be accomplished when need for activation of the EOF is no longer necessary.
G.
APPENDICES 1.
Figure #1 - Floor Plen of General Electric BWR Training Center.
TECH SPEC REFERENCES 1.
None.
O Page 2 of 2
EOF-14 Revision 0
'9"
81 December 1981 f
i l
'E 1
b4
/
t
=
xn m C(
A ve no i~ c, M
1 DOOO
- N N
N B<
\\(N
'm M
? osuv xuox 7
g mok4
)k
- .v ni y'
0
74 O
=*
a<
(
33 oemu 6 ['
Dic <
.)
o -c-4
>5{(
simuuToR.
pgg l
<9 -
4 t-s >omrr a n
v
/
s; e
/
mm s
/
M G K 'S 1
/
OYC
$w. _
J V,
s
..s GE BWR TRAXXG CETIR s-h.s vuw awawel e
O DRESSEN STATlO4 EOF M
- -