ML20040A738

From kanterella
Jump to navigation Jump to search
Submits Comments Re Nov 1981 Monthly Rept for Edgemont Cleanup Action Program.Authorizes Initiation of Review of Data from mini-engineering Assessments Completed to Date. Std Order for DOE Work Encl
ML20040A738
Person / Time
Issue date: 12/30/1981
From: Eadie G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Wogman N
Battelle Memorial Institute, PACIFIC NORTHWEST NATION
Shared Package
ML20040A739 List:
References
CON-FIN-B-2217, REF-WM-40 NUDOCS 8201220025
Download: ML20040A738 (2)


Text

$ & W..t0 2 0 Q W ~SE 2 Pro.jectiF11SWM-40' d

WMUR w/f WMUR r/f DEC 3 9 !93}

WM r/f NMSS r/f Wit-40/GGE/SB/81/12/28

_fjfL. EGEadie hPettengill RScarano JLinehan Wi1VR:GGE DEMartin FIN NO. B-2217 REBrowning UM-40 M

Dr. N. A. Wogman, flanager

'^

'\\

M_ Celi i

Radiological and Inorganic Chemistry Section Battelle Pacific Northwest Laboratories tq g

,0, 902s ~

Post Office Box 999 3

.i 3

Richland, Washington 99352 f i,N:

/

p4

. z;

Dear Dr. Wogman:

\\_

g/

I have reviewed your monthly report for the Edgemont Cleanup Actih Program (B-2217) for November,1981, and have the following comments:

1)

You should continue to emphasize completing all remaining full-cngineering assessments at those properties which have been identified to date as requiring such full-EAs, 2)

You are authorized to initiate the review of data from the mini-EAs completed to date and to draw conclusions correlating soil sam analysis or gamma radiation level results versus grab or long ple term radon progeny. measurements.

This evaluation should be completed and reported no later than your fiarch,1982 monthly letter report.

3)

You are authorized to mail, as soon as possible, the survey request letter and the legal release and indeminity form to the remaining Edgemont homeowners.

4)

Your revised summary tables for the grab Working Level Surveys and the Lot Surveys were acceptable.

5)

Your Financial Statement was acceptable.

Please continue to keep me informed of any incr?ased costs due to the subcontract arrangement with ARIX, Inc. for the performance of I

architect-engineering services necessary to complete the i

engineering assessments.

l l

l

............ D. I. S. T. :............................................... T. I. C. K. E. T.. N. 0. :...................

l l

l l

l OFC

-_ -_
. 8201220025 811230

! NAf~tE '.

PDR WASTE

- _ _ _ - : - _ _ _H_M_ _ _4_0_ _ _ : _ _ _ _ _ _. _ P DR I

t l D. A. T. E.. : 81. /.12. /. 5...... :............. :............. :............. :............. :............. :.......,,,,

i

-l l

I WM-40/GGE/SB/81/12/28 DEC 3 019~81 6)

Enclosed for your information is a copy of NRC-Form 173 (dated December 22,1981) which provides the balance of FY82 funding.

All other aspects of your November,1981 report were acceptable. The actions taken in this letter are considered to be within the scope of the current contract (B-2217).

No changes to costs or delivery of contract products are authorized.

Please notify me immediately if-you believe this letter would result in changes of contract products.

Origina101 ncd by 3

Gregory G. Eadie, Project ihnager Uranium Recovery Licensing Branch Division of Waste fbnagement Enclosure NRC-Form 173 cc:

R. Perkins, PNL P. O. Jackson, PNL i

1 l

{

DIST:

TICKET N0:

i l

. : _ _ _ _ _ _ _ _ //

l OFC :

WMUR ([

WMUR['

WMUR l NAME : GGEadi :sb HPette g

  • RScarano i.. __:.._____'_____:. __________:____________:......... __:___......___:..... ______:___________

i D. A. T. E.. :. 81./.12/. fyP).'d.. :. 81/.1,2/j D.... :. 81/12 / j4.................................

c I

J

- _.